Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

25-11-22 Operational Management and Maintenance Plan_Issue A

of 25

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FORM D — FINISHED LEVELS

Purpose: To ensure finished levels of system surface and bunds are correct and meet the design.

ACTION (IF

ITEMS CHECKED SATISFACTORY UNSATISFACTORY)

INITIAL

|
Landscaping topsoil applied to |
surrounding bunds to achieve design
levels

As-constructed survey of system surface |

 

and surrounding bunds completed

Final constructed levels are consistent
with design levels

Under-drainage clean-outs extended 50-
150 mm above filter media

Under-drainage pipes flushed to remove

initial ingress of material

HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)

 

NB: As constructed survey and drawings and photos attached

Signed by superintendent: Signed by bioretention designer:
Print name: Print name:

Date: Date:
Log in to download the original file

25-11-22 Operational Management and Maintenance Plan_Issue A.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.