Original source · versioned page text
25-11-22 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
FORM E — COARSE SEDIMENT FOREBAY Purpose: To ensure the coarse sediment forebay is constructed correctly. ACTION (IF ITEMS CHECKED SATISFACTORY UNSATISFACTORY) INITIAL Extent of coarse sediment forebay correctly set out Rocks to be used to line base of forebay are correct size and shape | | Base of constructed forebayisflatand | | set at the correct level below the surface | of the filter media Rocks placed for energy dissipation are location Interface between forebay and filter media is structurally sound and not prone | | | of appropriate size and are in correct | | to collapse HOLD POINT: Superintendent or bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: As constructed survey and drawings and photos attached Signed by superintendent: Signed by bioretention designer: Print name: Print name: Date: Date:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.