Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

25-11-22 Operational Management and Maintenance Plan_Issue A

of 25

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
4.3 Inspection and maintenance checklist for bioretention systems

ASSET TYPE Bioretention ASSET ID
Location

Date

Date of last rainfall Weather

Officer's name

Bioretention plan

Insert diagram or plan of the asset showing key features e.g. locations of inlet, outlet, and overflow

Additional information
Time taken to complete inspection or maintenance

Photos of site 1.
(explanatory notes)

General comments and sketches

Officer's signature

Maintaining Vegetated Stormwater Assets Vers on | waterbudesign 41
Log in to download the original file

25-11-22 Operational Management and Maintenance Plan_Issue A.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.