Skip to the record
The gold standard in government transparency.

Original source · versioned page text

25-11-22 Operational Management and Maintenance Plan_Issue A

of 25

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FORM H — LANDSCAPE ESTABLISHMENT

Purpose: To ensure the correct plants are supplied, installed and established.

ITEMS CHECKED

PLANT ESTABLISHMENT

Weeds being removed as required |
— —t—_ - -

Watering occurring as required

Replanting occurred as required to
replace failed plants

Plants successfully established plants
propagation is occurring.

Measure of successful establishment

1. Survivorship greater than 90%

2.80% coverage of system

3. Preferably more than one species per
macrophyte zone

4. At least 5 plants/m2 (preferably 6-10
plants/m2)

5. Plant height of at least 50%. This can
be measures through the use of
marker or stakes through the
bioretention

6. Propagation is occurring (more than
2-3 stems, seeding)

7.No weeds.

Growth and maturity should be recorded

through three-monthly photo logs every
500 m2.

 

ACTION (IF

BAST ACTORY. UNSATISFACTORY)

 

 

HOLD POINT: Superintendent AND bioretention designer inspection and sign-off.

Comments (attach and refer to additional pages if necessary)

NB: As constructed drawings and photos attached.

Signed by superintendent:
Print name:

Date:

Signed by bioretention designer:
Print name:

Date:

 

INITIAL
Log in to download the original file

25-11-22 Operational Management and Maintenance Plan_Issue A.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.