Other Change Decision Notice - Council Meeting Decision 131998 981211 5
Fencing to Protected Land
85. A permanent fence or permeant markers must be constructed along the entire length of
the interface of the site with the vegetation protection covenants. The fence / markers
must be constructed in accordance with an Operational Works approval and must be to
the following specifications:
a. allow adequate clearance at ground level for local macropods
b. not include any use of barbed wire or similar materials
c. constructed of fire-proof materials
Fauna Management
86. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an
Operational Works approval.
*(Refer to Advisory Note)
Bushfire Management
87. The development must be carried out in accordance with Bushfire Hazard Assessment
and Management Plan v4 prepared by North Coast Environmental Services dated
06/09/2024, which must be amended to include:
a. Revised plans that incorporate the latest architectural plans that show the
clamping infrastructure wholly outside of the Noosa plan Bushfire hazard mapping
potential impact buffer.
b. Section 5.3 Water Supply is to be updated to include a minimum of 20,000 litres
of dedicated static water supply for firefighting purposes for each group of 7
cabins. The last paragraph of this section needs to be updated as an error is
present “shared between 2 cabins’ This should read 7.
c. Revised plans that demonstrate a minimum 10,000 litres of dedicated static water
supply for firefighting purposes is available at the shelter in place location.
d. Revised plans that incorporate the recommended fire access trail within Lot 394
M371117 (see Plate 23 of the Bushfire Hazard Assessment and Management
Plan) and extending along the southern boundary until it meets the eastern
boundary of the subject site, before gaining access to Road 176.
e. Detail that the fire access trail along the southern boundary is to be gated and
used for emergency access only.
The report must be resubmitted and approved by Council incorporating the above
amendments prior to the issue of any Development Permit for Operational Works.*
88. The development must be carried out in accordance with Bushfire Evacuation Plan v4
prepared by North Coast Environmental Services and dated 06/09/2024, which must be
amended as follows
a. Revised plans that that incorporate the latest architectural plans that shows the
internal evacuation route that connects directly between the shelter in place
building and the clamping infrastructure.
b. Section 8 Evacuation Triggers, to be updated to include:
i. Daily review of FDR forecasts for the Southeast Coast which are available
from the Bureau of Meteorology
ii. Evacuation of all guests and non-essential staff prior to the commencement
of any day with a forecast FDR rating of Extreme or Catastrophic.
Page 12 of 21
Document Set ID: 23418211