                        c.      Section 7 Evacuation Routes, to incorporate detailed plans of the secondary
                                emergency access and associated maintenance requirements.
                        The report must be resubmitted to Council incorporating the above amendments prior
                        to the issue of any Development Permit for Operational Works.*
                        *(Refer to Advisory Note)
                89.     The site must be provided with water storage reservoirs for emergency firefighting
                        purposes in accordance with the amended Bushfire Hazard Assessment and
                        Management Plan. Such storage must be provided in addition to the water supply
                        capacity required for the use and must be provided in the form of a static water supply
                        tank. If by rainwater tank, water storage for firefighting purposes must be provided either
                        in a separate rainwater tank or a reserve section in the main water supply tank on which:
                        a.      the domestic take off from the tank is at or above the required amount of water
                                required by the amended bushfire management plan; and
                        b.      standard rural fire brigade fittings are fitted to the tank outlet for access by four
                                wheel drive rural services vehicles.
                90.     The site must be provided with an auxiliary power supply such as a petrol driven fire
                        fighter pump (or generator), together with a hose of sufficient length to easily reach
                        around to all sides of the building.
                91.     A copy of the Bushfire Hazard Assessment and Management Plan listed within this
                        Decision Notice must be provided to the nearest fire authority.
                92.     Certification must be submitted to Council from a qualified person* which certifies that
                        the development has been constructed in accordance with the bushfire management
                        conditions of this Decision Notice.
                        *(Refer to Advisory Note)
                93.     The development must be managed in accordance with the Bushfire Evacuation Plan
                        listed within this Decision Notice.
                        *(Refer to Advisory Note)
                94.     A copy of the Bushfire Evacuation Plan for the development must be provided to the
                        nearest fire authority.
                        Performance Bond
                95.     Security in the form of a cash bond or trading bank guarantee to the sum of $50,000
                        must be submitted to Council, to secure performance of all conditions of this approval,
                        prior to the issue of a Development Permit for Operational Works. The cash bond or
                        trading bank guarantee will be returned on performance of the conditions of approval
                        less any costs incurred by Council in respect of enforcing performance of this permit.
                        Council reserves the right to call upon the bond or guaranteed sum to effect compliance
                        with conditions.
                        External Works – Kabi-Cootharaba Intersection
                96.     The existing intersection joining Cootharaba Road with Kabi Road must be upgraded to
                        include a sealed Basic Right Turn Treatment. The works must be undertaken in
                        accordance with an Operational Works approval, be generally in accordance with
                        section 7.2 of Austroads’ A Guide to Road Design Part 4A, sections 5, 6 and 8 of BMC
                        Traffic’s Traffic Engineering Assessment Report (Doc ID: 22354477) dated 22 March
                        2023, The Noosa Plan 2020 – PSP6 Engineering Design Standards, and include, but
                        not be limited to:
                        a.      a design prepared by a suitably qualified person (RPEQ);




                                                                                                          Page 13 of 21
Document Set ID: 23418211
Version: 10, Version Date: 02/01/2025
Log in to download the original file

Other Change Decision Notice - Council Meeting Decision 131998 981211 5.pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.