8. The Assessment Manager for building work shall ensure that all other permits required
by this permit have been obtained and outcomes from imposed conditions incorporated
into the building plans prior to issue of a Development Permpermait for Building Works.
9. All parking associated with the approved use shall be provided within the development
site.
Formalised On-Site parking shall be for at least 80 car spaces, 2 Tourist Bus bays,
including a minimum of 10 spaces for staff. At lease 4 spaces shall be clearly marked
for disabled car spaces.
Additional contingency car parking shall be provided on shite for at least another 10 car
spaces and 1 tourist Bus and expanded as necessary to meet demand.
The car parking areas shall be designed to comply with the provisions as AS 2890.1-
1993 for user class 2.
10. The formal car parking area shall be drained and the constructed with gravel pavement
using materials that minimise dust.
The access from the property boundary to the car park area shall be constructed to
access road standards except as a sealed road for the first 100 meters from the property
boundary and gravel thereafter using materials consistent with the formal car park area.
Plans specifications for these works shall be submitted in conjunction with an application
for a Development Permit for Operational Works
11. Provided that the use authorised by this permit has not lapsed, all carparking shall be
kept maintained and line-marked in a condition fir for use to the reasonable satisfaction
of the Manager-Land Development.
12. A contribution toward roadworks external to the development site in the Cootharaba
Road catchment shall be paid prior to the commencement of this approval use. The
amount of the contribution as at September 1999 is $100,000 and shall be subject to
changes in the Consumer Price Index, All Groups Brisbane, up until the date of payment.
13. Prior to the commencement of the use, Kabi Road shall be upgraded to local road
standard of 6m seal on 8m gravel formation for its full length from the intersection with
Cootharaba Road to the development site, at not cost to Council. Subject to satisfactory
traffic management being incorporated into the design of Kabi Road and fill batters being
at a maximum grate of 1:6, the gravel pavement width may be reduced to 7 metres.
Design details to be submitted in conjunction with the application for a development
permit for operational works.
14. No Council property of facility shall be interfered with during works associated with this
development.
15. All designs for engineering works involving the construction of pavements, kerb and
channel, vehicular access, footpaths, turnouts, stormwater drainage, water supply or
sewerage reticulation shall be prepared in accordance with the requirements of
Council’s Engineering Design Standards, shall refence where applicable to Council’s
Standard Drawings and shall incorporate best engineering practice.
16. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works which shall be submitted in
conjunction with an application for Development Permit for Operational Works.
17. Prior to commencement of the use, a certificate shall be submitted to Council from a
registered Professional Civil Engineer certifying that he has supervised all operational
works and that all works have been completed in workmanlike manner in accordance
with good engineering practice and in accordance with permits/approvals required
pursuant to this approval.
Page 3 of 21
Document Set ID: 23418211
Version: 10, Version Date: 02/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.