Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment 2 - Existing Approval

of 113

Page text read automatically using OCR, there may be inaccuracies

               51.    Soil for landscaping must:
                      a.      Provide for healthy and sustained site specific vegetation performance.
                      b.      comply with AS 4419, Soils for landscaping and garden use.
                      On Maintenance
               52.    Maintenance periods* must be:
                      a.      12 months for Streetscape Landscape.
                      *(Refer to Advisory Note)
               53.    Prior to requesting an On Maintenance inspection, the following information package
                      (prepared by respective qualified persons* and certifying compliance with approvals) must
                      be submitted to Council:
                      a.      All required bonds.
                      b.      Landscaping certification.
                      c.      Tree certification in accordance with AS 2302 – Tree Stock for landscape use
                      d.      Arborist Report documenting and certifying the findings and outcome of the arboreal
                              risk assessment.
                      e.      Fauna Report documenting the findings and outcome of the fauna protection works
                              undertaken.
                      f.      Soil amelioration certification.
               54.    On Maintenance management includes:
                      a.      Establishing and maintaining the works in accordance with the intent and requirements
                              of all approvals.
                      b.      To aesthetically compliment the surrounding local area.
               55.    Rectification of works failing ‘on ground’ to a solution that still meets approval intents.
                      a.      Regular mowing, weeding and fertilising of grass areas.
                      b.      Mulching, fertilising and aeration of garden areas.
                      c.      Cleaning of all external surfaces including prompt removal of graffiti.
                      d.      Replacement of dead or poorly performing plants.
               56.    Repair and replacements of damaged landscape infrastructure (furniture and fixtures).
                      Off Maintenance
               57.    Prior to requesting an Off Maintenance inspection the following must be provided:
                      a.      Written request of bond release.
               58.    Off Maintenance Inspection must be requested:
                      a.      By contacting Council.*
                      b.      Only after lodgement of a completed Landscape Checklist and all other required
                              certification and documentation.
                      c.      Only after all works are confirmed in good order including:
                              i.       Remulching, fertilising and aeration of garden areas.
                              ii.      Replacement of plant material.
                              iii.     Removal of plant material impeding regulation sightlines.
                      *(Refer to Advisory Note)




                                                                                                        Page 22 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025

Log in to download the original (Attachment 2 - Existing Approval.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.