                      Detention Tanks
               59.    Underground detention tanks are to be provided with the detention sizes and volumes and
                      outlet configurations as shown in the concept on drawing 33132-SW1.3 Rev E by SCG
                      Consulting. Certification is to be provided by the tank manufacturer prior to installation that
                      the tanks incorporate all features required by AS3500.3:2021 Section 7.10.2.
                      Bioretention Basins – Construction
               60.    During construction and establishment of the bioretention devices, the supervising RPEQ
                      must ensure that the device was constructed in accordance with the document Construction
                      and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
                      Design, 2009) and that the forms contained in section 3.15 including the associated
                      supporting information and data are completed. These forms and certification from the RPEQ
                      that the device has been constructed in accordance with the Construction and Establishment
                      Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), all
                      conditions of approval, and the approved engineering drawings must be submitted to Council
                      prior to commencement of use.
               61.    A construction hold point with a council delegate shall be established once the bioretention
                      device underdrainage pipe work is installed. At the time of inspection, a sample of the
                      drainage layer, transition layer, and filtration media materials must be stockpiled on-site.
                      Laboratory results must be provided for the filter media which demonstrate that the media
                      complies with the specifications contained in the latest version of the “Guidelines for Soil
                      Filter Media in Bioretention Systems” (produced by the Facility for Advancing Water
                      Biofiltration) and that the minimum hydraulic conductivity specified on the approved
                      engineering plans will be achieved. In addition laboratory results must be provided
                      demonstrating that the transition layer and drainage layer meet the following bridging criteria:
                      (a)     D15 (drainage layer) ≤ 5 × D85 (transition layer)
                      (b)     D15 (transition layer) ≤ 5 × D85 (filter media)
                      The drainage layer, transition layer, and filtration media materials shall not be installed until
                      the catchment draining to the bioretention device has 70% groundcover as determined by
                      Council’s delegate.
               62.    Prior to issuing of a final compliance certificate, council must receive evidence that the results
                      for the in-situ hydraulic conductivity testing conducted in accordance with FAWB PRACTICE
                      NOTE 1: In Situ Measurement of Hydraulic Conductivity Belinda Hatt, Sebastien Le
                      Coustumer April 2008 for the bioretention filter media achieve the design criteria.
                      Erosion and Sediment Control
               63.    A ‘for construction’ Erosion and Sediment Control Plan (E&SCP) must be provided to
                      Council’s Delegate at least 2 weeks prior to the on-site pre-start meeting and prior to works
                      commencing. The E&SCP must:
                      a.      be prepared by a suitably qualified and experienced professional;
                      b.      relate to each phase of the works (including clearing, earthworks, civil construction,
                              services installation and landscaping) and detail the type, location, sequence and
                              timing of measures and actions to effectively minimise erosion, manage flows and
                              capture sediment;
                      c.      be consistent with current best practice standards to the extent that the standards are
                              not inconsistent with the conditions of approval and taking into account all
                              environmental constraints including erosion hazard, season, climate, soil, and
                              proximity to waterways;
                      d.      provide sufficient detail regarding the manner in which compliance with all conditions
                              of this permit relating to E&SC is to be achieved;
                      e.      include details of proposed flocculants and automatic dosing systems for sediment
                              basins, including jar testing results. Demonstrate the suitability of the proposed


                                                                                                        Page 23 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025

Log in to download the original (Attachment 2 - Existing Approval.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.