Attachment 2 - Existing Approval
Landscaping Works
28. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
a. the works shown on the referenced landscape plans;
b. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage
c. provision of 1 street tree within the road reserve for every 8 metres of road frontage
29. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Fauna Management
30. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
Works approval.
*(Refer to Advisory Note)
Noise
31. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
i. 7am to 10pm: Maximum level allowable = background + 5dB(A)
ii. 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps, Service Room
i. 7am to 7pm: Maximum level allowable = background + 5dB(A)
ii. 7pm to 10pm: Maximum level allowable = background + 3dB(A)
iii. 10pm to 7am: No audible noise.
32. The certification must be submitted to Council, which certifies that operational noise from any
fixed plant and equipment complies and with the requirements of this Decision Notice.
Waste Storage
33. The refuse areas must be of muted environmental tones to reduce the visual impact of the
infrastructure in the streetscape and suitably screened by landscaping where viewed from
the street.
34. The development must use muted environmental colour tones that blend with the natural
environment.
35. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap, hose
and drain outlet connected to sewer, via a bucket trap. The drain outlet must be designed to
prevent storm water entry to the sewerage system.
36. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
Page 7 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 2 - Existing Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.