Attachment 2 - Existing Approval
External Works
37. Eumundi Noosa Road and Headland Drive must be upgraded for the length of their frontage
to the subject site. The works must include in particular:
a. Extension to the central medians on Eumundi Noosa Road and Headland Drive to
prohibit right-turn movements into and out of the development. The works are to retain
the existing widths of through lanes, cycle lanes, shoulders and on-street parking.
b. Construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice.
c. Removal of the existing property accesses and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed.
Condition 37 (a) and (c) is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Condition 37 (b) is imposed pursuant to s128 of the Planning Act 2016 being trunk
infrastructure.
Site Access and Driveways
38. A sealed access driveway must be provided from Eumundi Noosa Road and Headland Drive
to all parking and manoeuvring areas of the development. The works must be undertaken in
accordance Council Standard Drawing RS-051.
Car Parking
39. A minimum of 50 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. A minimum of 40 covered parking spaces within the total;
b. 10 visitor parking spaces within the total, which are clearly marked for that purpose and
accessible at all times for visitor use;
c. 1 disabled parking space/s within the total;
d. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
40. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian and Bicycle Facilities
41. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. a 3 metre wide footpath within the road verge for the entire length of the site’s frontage
to Eumundi Noosa Road;
b. the resealing of the existing asphalt path fronting the development.
Condition 41 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
42. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual.
Condition 42 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Page 8 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 2 - Existing Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.