MCU18.0166 - Response to Information Request (amended)
7. Mitigation measures
This section addresses the mitigation measures
developed to avoid, reduce and manage the
identified potential adverse operational and
construction visual impacts.
Mitigation measures during construction:
• All works equipment and materials would be
contained within designated boundaries of
the worksite.
• Trees outside the construction footprint
would be retained and protected during
construction in accordance with AS4970
Protection of trees on development sites
• Stockpiles, waste, and vehicle parking would
be located within the site and set back from
Tablelands Road.
Mitigation measures during operation:
• The monopole and all attachments would
be treated with a non-reflective finish
• The tower would be painted a bushland
green colour, such as Colourbond© Pale
Eucalypt, which blends into the vegetated
background.
IRIS Visual Planning + Design Page 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.