Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU18.0166 - Response to Information Request (amended)

of 77

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

7. Mitigation measures
This section addresses the mitigation measures
developed to avoid, reduce and manage the
identified potential adverse operational and
construction visual impacts.
Mitigation measures during construction:

•   All works equipment and materials would be
    contained within designated boundaries of
    the worksite.

•   Trees outside the construction footprint
    would be retained and protected during
    construction in accordance with AS4970
    Protection of trees on development sites
•   Stockpiles, waste, and vehicle parking would
    be located within the site and set back from
    Tablelands Road.
Mitigation measures during operation:

•   The monopole and all attachments would
    be treated with a non-reflective finish
•   The tower would be painted a bushland
    green colour, such as Colourbond© Pale
    Eucalypt, which blends into the vegetated
    background.




IRIS Visual Planning + Design                      Page 44
Log in to download the original file

MCU18.0166 - Response to Information Request (amended).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.