Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08/0749 - Op Works - Dam [As Published] · 142008.749

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
{development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?

4] No - Goto Q1.2 O Yes - (Complete Form 1, Part C,) This application requires assessment by the relevant local government against the IDAS
Cade in the Queensland Heritage Regulation 2003. if the development involves building work and the local
government is not the Assessment Manager for the application, the focal government has jurisdiction as Concurrence

     

 

 

Agency.
Tae Bed cE oy a a oa BG
[REMOVING QUARRY MATERIAL; WILD RIVER AREA |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?

IX} No-Gotwar3 [_] Yes

IPA, schesiute 8 part 1 table $. tom 7, 1P Reyulaten schedule 2, table 2. dem 11, 1P Regulation, schedute 1 table 5, tem 2 (wid uver area}; Water Act 2000,
Section 9660, Wid Rivers Aci 2005 section 3A

 

 

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA |
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

PX] No-Gotonr4 {[] Yes

IPA scesdoie 3 pant tiabhe’ em 7 eA schedule d pat} table $ dems 3 cnd 4 {P Reguia wenedute 2 rable 7 toms Pand 2. binonmemal Prutcchen Act 1994, section

     

TRAA twaid iv ate) And Rivers Act /005 secuan 434 seie .ant wel iver declarauon, Wild Rivers Cade

 

 

WITHIN THE LIMITS OF A PORT |
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

[IX] No - Goto. 01.5

(1 Yes

  

IP Requatan schedute 2. tabio 2 tems fs ane 16

 

DECLARED FISH HABITAT AREA |

 

16 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
KX] No - Gow ars

oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation. schedule 2. table 2 dem 26

 

 

 

 

‘COMMUNITY INFRASTRUCTURE ‘1
16 Is any part of the premises designated for community infrastructure?

[IX] No -Got0.01.7

LJ Yes

IP Regulation scnegite 3 faite d teat 7
WASTE WATER MANAGEMENT }
17 Does the proposal involve the establishment or expansion of a waste water disposal system?

[XJ No - nd of Section? {[_] Yes

JP Regulation schedule 2 table 3 tem §

 

 

IS ECTION 4 - Section 4 must be completed when the application seeks approval to carry out operational work.

 

 

‘PLANNING SCHEME |

 

41 Is any of the proposed operational work assessable under a planning scheme?
LJ No - Go to. Q4.2 DX] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

Used in these records

About this file

File size
970 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0749 - Op Works - Dam [As Published].pdf · 970 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.