Stormwater Management Plan
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
5.0 MAINTENANCE PERIOD
5.1 Bioretention Basin
The proposed bioretention basin will require consideration and management during both the
construction and operational phases of the development. In order to establish vegetation and
treatment functions in the bioretention system, the filter media must be protected from pollutants
commonly generated in the construction phases. During the operational phase, regular
maintenance of bioretention system is required to ensure comprehensive vegetation
establishment, a critical component in stormwater pollutant uptake. Below are details on the
general maintenance periods and requirements for the construction and operational periods.
5.1.1 Maintenance During ‘Construction Phase’
Erosion and sediment control devices will be installed at the commencement of all the staged
works to capture and treat runoff during construction works. The sediment control devices should
be cleaned out as required and at the end of the works. During the construction stage, all sediment
control devices are to be inspected weekly, after runoff generating rain events and prior and after
prolonged site shut downs (e.g. holiday periods).
Following construction of the roadways and buildings on site the basin will be constructed to the
final design and filter media layers and plants will be installed. Leaving the completion of the
bioretention basin until after construction is completed will prevent any potential clogging of the
system during the construction period.
6.0 STORMWATER QUANTITY
The proposed stormwater quantity management for this site ensures non-worsening of flows as a
result of the proposed development. Development of the site will result in an increase in
impervious area and a corresponding increase in peak stormwater runoff rates which will be
mitigated through on-site detention. This section of the report encompasses the hydrological and
hydraulic analysis for the proposed development and identifies the stormwater detention measures
required to ensure non-worsening conditions.
6.1 Stormwater Quantity Management
An analysis of the stormwater (quantity) required for the site, involved the following processes:
Determining the overall catchment areas contributing to flow from the proposed development
site;
Calculating the 1%, 10% and 39% Annual Exceedance Probability (AEP) peak discharges
using XP-RAFTS for existing case;
Rational method calculations for comparison and calibration of the XP-RAFTS runoff model
to ensure the accuracy of results; and
XP-RAFTS detention modelling for the 1%, 10% and 39% AEP design discharges to
demonstrate that peak discharges are mitigated in the developed case and flows leaving the
site are ‘non-worsening’.
6.2 Hydrology (XP-RAFTS)
XP-RAFTS was utilised to determine the peak stormwater discharges for the subject site for pre-
development and post-development scenarios.
Covey Associates Pty Ltd 6 Project No: 161968
Consulting Engineers 100415 Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.