Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
Table 3 – MUSIC Source Node Attribute Summary
Area
Source Node
(ha)
Roof 0.096
Road 0.437
Landscaping 0.181
Hardstand 0.042
Untreated Road 0.054
Untreated Landscaping 0.013
Total 0.823
4.4 Proposed Stormwater Treatment Train
The development has been modelled as one (1) catchment with the following mitigation measures
proposed. Refer to Stormwater Management Plans in Appendix B for details.
Stormwater runoff from the site will be treated by a Bioretention Basin prior to discharge off site.
Refer to Table 4 for bioretention basin sizing. Filter media is established to a depth of 0.5 m, with a
0.1 m and 0.2 m transition and drainage layer, respectively. The extended detention depth is 0.3
m.
Table 4 –Type and Size of Stormwater Treatment Device
Stormwater Treatment Device Detail
Catchment 1
Bioretention basin 115 m2 Surface Area, 115 m2 Filter Area
4.5 Pollutant Reduction Results
MUSIC modelling of the proposed stormwater treatment strategy for the site was performed to
ensure the identified load based pollutant reduction objectives were achieved. MUSIC version 6.2
has been used to model the effectiveness of the designed stormwater treatment trains.
The target reductions in stormwater pollutants are based on a comparison of an unmitigated
scenario i.e. having no treatment on site, and the mitigated scenario, which has stormwater
treatment measures incorporated into the site. The results of the MUSIC models for the each
catchment and the overall site can be found in Table 5 and demonstrate that compliance has been
met or exceeded for all the required pollutant load reduction objectives stated in the State Planning
Policy (2014) at catchment and site level.
Table 5 – MUSIC Results –Treatment Train Effectiveness
Reduction Target
Unmitigated Mitigated
Pollutant Achieved Reduction Compliance
(kg/yr) (kg/yr)
(%) (%)
TSS 3380 687 80 80 Y
TP 6.54 1.61 75 60 Y
TN 35.3 14.8 58 45 Y
GP 234 19.7 92 90 Y
As the results in Table 5 demonstrates, the stormwater quality management strategies proposed
for the proposed Highway Service Station meet or exceed the target reduction rates required by
the NSC and the State Planning Policy (2014).
Covey Associates Pty Ltd 5 Project No: 161968
Consulting Engineers 100415 Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.