Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                         Location: Taylor Court, Cooroy

                                Table 3 – MUSIC Source Node Attribute Summary
                                                                        Area
                                         Source Node
                                                                         (ha)
                                              Roof                      0.096
                                             Road                       0.437
                                          Landscaping                   0.181
                                           Hardstand                    0.042
                                        Untreated Road                  0.054
                                     Untreated Landscaping              0.013
                                             Total                      0.823

4.4 Proposed Stormwater Treatment Train

The development has been modelled as one (1) catchment with the following mitigation measures
proposed. Refer to Stormwater Management Plans in Appendix B for details.

Stormwater runoff from the site will be treated by a Bioretention Basin prior to discharge off site.
Refer to Table 4 for bioretention basin sizing. Filter media is established to a depth of 0.5 m, with a
0.1 m and 0.2 m transition and drainage layer, respectively. The extended detention depth is 0.3
m.

                             Table 4 –Type and Size of Stormwater Treatment Device
            Stormwater Treatment Device         Detail
            Catchment 1
            Bioretention basin                            115 m2 Surface Area, 115 m2 Filter Area

4.5 Pollutant Reduction Results

MUSIC modelling of the proposed stormwater treatment strategy for the site was performed to
ensure the identified load based pollutant reduction objectives were achieved. MUSIC version 6.2
has been used to model the effectiveness of the designed stormwater treatment trains.

The target reductions in stormwater pollutants are based on a comparison of an unmitigated
scenario i.e. having no treatment on site, and the mitigated scenario, which has stormwater
treatment measures incorporated into the site. The results of the MUSIC models for the each
catchment and the overall site can be found in Table 5 and demonstrate that compliance has been
met or exceeded for all the required pollutant load reduction objectives stated in the State Planning
Policy (2014) at catchment and site level.

                             Table 5 – MUSIC Results –Treatment Train Effectiveness
                                                              Reduction          Target
                           Unmitigated      Mitigated
      Pollutant                                               Achieved          Reduction       Compliance
                             (kg/yr)         (kg/yr)
                                                                 (%)               (%)
          TSS                 3380             687                 80               80               Y
           TP                 6.54             1.61                75               60               Y
           TN                 35.3             14.8                58               45               Y
          GP                  234              19.7                92               90               Y

As the results in Table 5 demonstrates, the stormwater quality management strategies proposed
for the proposed Highway Service Station meet or exceed the target reduction rates required by
the NSC and the State Planning Policy (2014).




Covey Associates Pty Ltd                              5                                        Project No: 161968
Consulting Engineers                                                                              100415 Rpt Iss A
Log in to download the original file

Stormwater Management Plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.