Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                             Location: Taylor Court, Cooroy

Sufficient consideration of stormwater controls has been demonstrated by:

      Compliance with QUDM (2013)
      Compliance with the requirements of Noosa Shire Council’s Load Based Objectives
      Compliance with the State Planning Policy (2014)
      Compliance with the EPP (Water) 1997
      Ecological sustainability in terms of the development’s impact upon receiving waters and the
       viability of the proposed site development.

The measures proposed within this report to manage stormwater quality and quantity achieve the
nominated requirements of NSC and the State Planning Policy (2014). This preliminary design of
the quality and quantity management measures is based on the current and best-practice
principles.

REFERENCES
Department of Environment and Resource Management (2010) Environmental Protection (Water)
     Policy 2009 – Maroochy River Environmental Values and Water Quality Objectives Basin No,
     141 (part) including all tributaries of the Maroochy River

Department of State Development, Infrastructure and Planning (2014) State Planning Policy,
     Brisbane, Queensland.

Institute of Public Works Engineering Australia, Queensland Division Ltd (2013) Queensland Urban
       Drainage Manual, Third Edition.

Noosa Shire Council (2013) The Noosa Plan

Water by Design (2010) MUSIC Modelling Guidelines – South East Queensland, Version 1.

Water by Design (2014) Bioretention Technical Design Guidelines, Version 1.1.




Covey Associates Pty Ltd                     11                                    Project No: 161968
Consulting Engineers                                                                  100415 Rpt Iss A
Log in to download the original file

Stormwater Management Plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.