Stormwater Management Plan

Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust                                   Location: Taylor Court, Cooroy




                                               Site
                                               Area




                 Figure 2 - Site Locality (image accessed from Nearmap on 11 August 2015)

2.2 Previous Land-use, Topography and Drainage

The site is currently vacant land and was previously used as a temporary depot for the machinery
used for the upgrade of the Bruce Highway. The site predominantly drains from north to south, with
an approximate slope of 4%.

2.3 Proposed Land-use

The overall site area is approximately 8243m2, with the area of the proposed new development
utilising the entirety of the site. The proposed development for a highway service centre includes
the service station bowsers, fast food outlet, service station, children’s play area, services, truck
parking and associated carparking and landscaped areas.

A Site Plan is located in Appendix A for further detail.

3.0 WATER QUALITY AND TREATMENT OBJECTIVES
This SMP will demonstrate how the proposed stormwater management strategy complies with the
requirements of the Noosa Shire Council (NSC) and the State Planning Policy (2014), in terms of
demonstrating how the relevant stormwater pollutant reduction objectives will be met. Discharge
from the site must achieve pollutant load reduction targets (Table 1) and be demonstrated through
use of the appropriate modeling software.

                      Table 1 – Pollutant Reduction Targets for South East Queensland
          Pollutant Type                                   Reduction Objective
   Total Suspended Solids (TSS)     80% reduction in average annual load of pollutants
   Total Phosphorus (TP)            60% reduction in average annual load of pollutants
   Total Nitrogen (TN)              45% reduction in average annual load of pollutants
   Gross Pollutants (GP)            90% reduction in average annual load of pollutants




Covey Associates Pty Ltd                        2                                        Project No: 161968
Consulting Engineers                                                                        100415 Rpt Iss A
Log in to download the original file

Stormwater Management Plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.