Stormwater Management Plan
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STORMWATER MANAGEMENT PLAN
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
3.1 Water Quality Objectives
The nearest water course to the site is the North Maroochy River and is located within the
Maroochy River Basin Catchment Plan. The Environmental Protection Water Policy 2009 South
East Queensland Map Series (Plan WQ1411) identifies North Maroochy River to be lowland
freshwaters. Table 2 outlines the specific performance criteria required within lowland freshwaters
in the Maroochy River Basin Environmental Values and Water Quality Objectives – Basin No. 141
(part) including all tributaries of the Maroochy River (Department of Environment and Resource
Management, 2010).
Table 2 – Site Stormwater Quality Objectives
Pollutant Water Quality Objectives
Lowland Freshwater Values
Suspended Solids (SS) <6 mg/L (annual mean concentration)
Total Phosphorus <50 µg/L (annual mean concentration)
Total Nitrogen <500 µg/L (annual mean concentration)
Turbidity <10 NTU
Aim for no visible oils, petrochemicals, films
Hydrocarbons
or odours
Dissolved Oxygen 85 – 110 % saturation
Chlorophyll-a 5 µg/l
pH 6.5 – 8.0
Litter Aim for no anthropogenic material greater
than 5 mm in any dimension.
3.2 Area of Treatment
The total area of the site to be treated is approximately of 8243 m2. The site has been modelled as
one (1) catchment. The catchment consists of the north exit point, south entrance and exit road,
car and truck parking, service area and food outlets and the landscaped areas. Refer to the Site
Plan in Appendix A for further details.
3.3 Non-treatment Areas
The southern entry/exit point at the site onto Taylor court is unable to be treated due to the site
topography. This area comprises 673 m2 of the site and is not considered likely to cause adverse
impacts to the surrounding environment due to its small area. This area has been included within
the model as untreated road and untreated landscaping area. Refer to Figure 3 for details on the
untreated area.
Covey Associates Pty Ltd 3 Project No: 161968
Consulting Engineers 100415 Rpt Iss A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.