Plans Secondary Residence 33 Carramar St

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                    GENERAL SPECIFICATION                                                                                                              Construction Notes
     Written Dimensions to take precedence over scale If in doubt call Accolade Building Designs                        Timber Frame: Framing to be built in accordance with AS 1684 Termite protected timbers shall be used on all framing
     Builder to verify all dimensions & levels on site prior to commencement of work                                    Approved type flashing & sarking to be attached between cladding & frame along with slab & frame to prevent moisture getting to the frames
     All boundary setbacks to be strictly adhered to as minimum setbacks apply                                          All wet areas to be made waterproof or resistant to comply to AS 3740 & BCA 3.8.1
     Verify location of all services on site & all floor levels allow for connection to these services                  Linings used shall be approved for use in wet areas & shall be fixed in strict accordance
     All building work to be carried out to Aust Standards & to the relevant building codes of Australia                with Manufactures specifications. Recommended that all showers have a waterproofed hob
     Builder to supply footpath protection & show required signage to comply to council regulations &                   Or recessed into concrete slab during construction & shower screens fitted to above standards
     comply to the Workplace Health & Safety act.                                                                       Baths to installed to above standards & approved type sealants to be used to prevent water or Moisture getting into framework
                                                                                                                        Water stops or vertical barriers in the waterproofing system be installed to prevent passage of moisture in the floor to non wet areas of building
     Builder to supply sediment control where needed                                                                    Recommend Laundry floor to have a dry waste in floor & grade floor to it or to door to allow for overflow
     All work to comply to the National Construction Codes 2014                                                         Wet Areas include Bathrooms Ensuite Laundry & WC or Powder rooms
     Termite protection to AS. 3660.1 2/durable notices to be installed in prominent locations stating
     method of protection, Date of installation, Life expectancy & frequency of inspections                             Tiled areas: Tiles to laid or fixed to a clean dry substrate to comply to AS 3958
     Smoke alarms to comply to AS. 3786 Hardwired in & interconnected                                                   Ensure water proofing is dry & is suitable for the adhesives or grouts to be applied to
                                                                                                                        Ensure the correct tile is being used for the application (ie. Floor tiles on Floors)
     Concrete slab & footings to be designed by Engineers from Soils Tests & to comply with AS. 2870
     All structural Timbers to comply with National Timber Framing Codes AS. 1684.2 & AS . 1720 &                       All walls to be checked to ensure they are fixed correctly, straight & plumb prior to fixing plasterboard or interior lining
     Construction Timbers Queensland(CTIQ)                                                                              Plasterboard or interior linings to be fixed to dry frames in strict compliance with manufactures details. Setting of plasterboard to be done in
     All Steelwork to comply to AS. 4100 for steel structures                                                           strict compliance with manufactures specifications, Sanded to provide a flat smooth finish
     Roof trusses to be designed by manufacture & Certified, Truss manufacture/Engineer to determine or confirm
                                                                                                                        Painting: Paints & application to comply to AS 2311 Min 3 coat application system to be used
     all lintel sizes under standard & Girder trusses for load bearing capabilities                                     Substrate to be clean & dry correct type sealers & primers to be used for substrate
     Lighting to comply with AS.1680.1 & B.C.A. Vol 2 Part 3.8.4.2 & 3                                                  If paint is sprayed on then a back roll should be done between coats & after final coat
     Electrical installations to comply to AS. 3000 & other relevant regulations                                        Mould resistant paint to be used in Bathrooms, Ceilings to have approved ceiling paint applied & be a matt finish
     Plumbing & drainage to comply to AS. 3500 Hot water system to AS. 3500 4.1
     Internal Wet Areas to comply to AS. 3740 as in B.C.A. Vol 2, Part 3.8.1                                            All external manufactured timbers to be H3 Treated & sealed painted or encased made weather proof
                                                                                                                        in strict accordance with the manufactures specifications
     External waterproofing to comply to AS. 4654
     Windows & Glazing to AS.2047 -1999 Screening or security screens to comply to                                      Concrete slabs & footings to be poured to Structural Engineers Specifications & in accord with AS 2870
     relevant regulations. Type of glass used to be determined by Energy Efficiency Consultant                          External concrete shall be have a NON-Slip Finish or a NON-slip coating applied to the surface
     Plasterboard to AS. 2589 Painting to AS. 2311 Tiling to AS. 3958
     Insulation to roof cavity & walls to be determined by Licensed Energy Efficiency Consultant to                     All external windows & doors to have appropriate flashing & seals fitted to prevent water getting into building or to the frame work
                                                                                                                        For all installations of windows follow manufactures instructions or Installation & Fixing Guide at www.awa.org.au
     Comply to Aust. & QLD. Standards & requirements
     Structural members Wind bracing & tie-down to be certified or designed by Structural Engineer                      New Dwelling; to have Min. 50 % of specified bracing installed prior to roof going on
     WC to be installed with 4.5/3 L dual flush cistern or better                                                       Existing Dwelling; During construction temporary propping & bracing to consulting Engineers satisfaction
     All taps & Shower roses to be AAA Conservation rating
     All roof water to be discharged to Council approved drainage point or street                                       Gang nail Splice plates NOT permitted for exterior timber beams
     All waste water to be connected to existing sewerage system
     These plans are for Certification & Building only. Items like Flooring, Tiles, Painting & other finishes
     Cabinetry Etc. to be decide by Owner & Builder prior Contract being signed Items must comply to relevant codes     Notes for Construction & Maintenance of Roofs
     The Builder must have BA Approval for the proposed works from either a Private Certifier or
     Local Council prior to work commencing                                                                             All timber trusses or rafters fixed in accord with AS 1684.2 for designated wind classification
                                                                                                                        Steel Roof battens fixed to Manufactures specifications for the spans, roofing type & Wind classification.
                                                                                                                        Timber roof battens fixed to AS1684.2 as per above
                                                                                                                        Roofing, Flashing & Gutters to be of compatible materials
                                                                                                                        Roof sheeting or tiles to be fixed to Manufactures specifications for N3 sites
                                                                                                                        Approved type sarking to be placed under roof sheet over battens fixed to Manufactures details
                                                                                                                        Screws to AS. 3566:2002 Class 3 or better. Blind rivets to be used screws & Rivets to be compatible material
                                                                                                                        Gutters to be fixed to AS/NZS 3500.3 2003. Gutter to have adequate fall to downpipes Min 1:500
                                                                                                                        Front of gutter to be lower than top of fascia or slots in the front of the gutter, or flashing behind gutter &
                                                                                                                        under the roof sheets fixed to roof battens to prevent water getting into roof cavity or soffit area
                                                                                                                        Adequate down pipes in appropriate places with rain water heads fitted Max 12 m spaces to be determined by Plumber
                                                                                                                        Recommend a good quality gutter guard be fitted to prevent leaf & other debris getting into gutter to block downpipes
                                                                                                                        Regular inspections & cleaning of gutters to be done depending on trees around the home
                                                                                                                        Regular cleaning & inspections of the roof is to be done including ensuring screws are still tight on the roof sheet
                                                                                                                        & neoprene washers are not cracking or degrading. Tiles are not cracked or loose & all grouting is in place & holding tiles firm & in place
                                                                                                                        (Recommended that a professional is called in with appropriate safety equipment to do inspections & cleaning)




Client: Rhys Williams        Address: 33 Carramar St Tewantin                                                                                                                           Mobile: 0407 693 018                               Date      16/02/2021 12:26:41 PM
                                                                                                              ACCOLADE Building Designs                                                                                                   Drawn by: S.Horn Drawn for A3 Sheet
RPD: Lot 62 on RP 854302          Site Area : 708.95 m²       Wind Classification N3                                  Proprietor: Steven Horn                                Email: [email protected] Project Number
                                                                                                                                                                                                                                                                           0418WR2
Proposed Secondary Residence Slab on Ground, Timber Framed, Sheet Roof,                                                  QBCC Lic. 54806                                     Issue Date            14 - JANUARY - 2021                          Sheet No. 7           of    8
Log in to download the original file

Plans Secondary Residence 33 Carramar St.pdf · 568 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.