Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
             1. FALLS, SLIPS, TRIPS                                                       2. FALLING OBJECTS                                                          5. MANUAL TASKS                                                             7. CONFINED SPACES
             a) WORKING AT HEIGHTS                                                        LOOSE MATERIALS OR SMALL OBJECTS                                            Components within this design with a mass in excess of 25kg                 EXCAVATION
             DURING CONSTRUCTION                                                          Construction, maintenance or demolition work on or around this              should be lifted by two or more workers or by mechanical lifting            Construction of this building and some maintenance on the
             Wherever possible, components for this building should be                    building is likely to involve persons working above ground level or         device. Where this is not practical, suppliers or fabricators should        building will require excavation and installation of items within
             prefabricated off-site or at ground level to minimise the risk of            above floor levels. Where this occurs one or more of the following          be required to limit the component mass.                                    excavations. Where practical, installation should be carried out
             workers falling. However, construction of this                               measures should be taken to avoid objects falling from the area             All material packaging, building and maintenance components                 using methods which do not require workers to enter the
             building will require workers to be working at heights where a fall in       where the work is being carried out onto persons below.                     should clearly show the total mass of packages and where                    excavation. Where this is not practical, adequate support for the
             excess of two metres is possible and injury is likely to result from such    1. Prevent or restrict access to areas below where the work is              practical all items should be stored on site in a way which                 excavated area should be provided to prevent collapse. Warning
             a fall. The builder should provide a suitable barrier wherever a                being carried out.                                                       minimises bending before lifting. Advice should be provided on              signs and barriers to prevent accidental or unauthorised access to
             person is required to work in a situation where falling more than            2. Provide toeboards to scaffolding or work platforms.                      safe lifting methods in all areas where lifting may occur.                  all excavations should be provided.
             two metres is a possibility.                                                 3. Provide protective structure below the work area.                        Construction, maintenance and demolition of this building will              ENCLOSED SPACES
             DURING OPERATION OR MAINTENANCE                                              4. Ensure that all persons below the work area have Personal                require the use of portable tools and equipment. These should be            For buildings with enclosed spaces where maintenance or other
             For houses or other low-rise buildings where scaffolding is                     Protective Equipment (PPE).                                              fully maintained in accordance with manufacturer’s                          access may be required:
             appropriate:                                                                                                                                             specifications and not used where faulty or (in the case of                 Enclosed spaces within this building may present a risk to persons
                                                                                          BUILDING COMPONENTS                                                         electrical equipment) not carrying a current electrical safety tag.
             Cleaning and maintenance of windows, walls, roof or other                    During construction, renovation or demolition of this building, parts of                                                                                entering for construction, maintenance or any other purpose. The
             components of this building will require persons to be situated                                                                                          All safety guards or devices should be regularly checked and                design documentation calls for warning signs and barriers to
                                                                                          the structure including fabricated steelwork, heavy panels and many         Personal Protective Equipment should be used in accordance
             where a fall from a height in excess of two metres is possible. Where        other components will remain standing prior to or after supporting                                                                                      unauthorised access. These should be maintained throughout the
             this type of activity is required, scaffolding, ladders or trestles should                                                                               with manufacturer’s specification.                                          life of the building. Where workers are required to enter enclosed
                                                                                          parts are in place. Contractors should ensure that temporary bracing
             be used in accordance with relevant codes of practice,                                                                                                                                                                               spaces, air testing equipment and Personal Protective Equipment
             regulations or legislation.
                                                                                          or other required support is in place at all times when collapse which      6. HAZARDOUS SUBSTANCES                                                     should be provided.
                                                                                          may injure persons in the area is a possibility.                            ASBESTOS
             For buildings where scaffold, ladders, trestles are not appropriate:                                                                                                                                                                 SMALL SPACES
             Cleaning and maintenance of windows, walls, roof or other                                                                                                For alterations to a building constructed prior to 1990:
                                                                                          Mechanical lifting of materials and components during construction,                                                                                     For buildings with small spaces where maintenance or other access
             components of this building will require persons to be situated                                                                                          If this existing building was constructed prior to:
                                                                                          maintenance or demolition presents a risk of falling objects.                                                                                           may be required:
             where a fall from a height in excess of two metres is possible. Where                                                                                    1990 - it therefore may contain asbestos
                                                                                          Contractors should ensure that appropriate lifting devices are used,                                                                                    Some small spaces within this building will require access by
             this type of activity is required, scaffolding, fall barriers or Personal                                                                                1986 - it therefore is likely to contain asbestos
                                                                                          that loads are properly secured and that access to areas below the                                                                                      construction or maintenance workers. The design documentation
             Protective Equipment (PPE) should be used in accordance with                                                                                             either in cladding material or in fire retardant insulation material. In
                                                                                          load is prevented or restricted.                                                                                                                        calls for warning signs and barriers to unauthorised access. These
             relevant codes of practice, regulations or legislation.                                                                                                  either case, the builder should check and, if necessary, take
                                                                                                                                                                                                                                                  should be maintained throughout the life of the building. Where
                                                                                                                                                                      appropriate action before demolishing, cutting, sanding, drilling or
                                                                                                                                                                                                                                                  workers are required to enter small spaces they should be
             b) SLIPPERY OR UNEVEN SURFACES                                               3. TRAFFIC MANAGEMENT                                                       otherwise disturbing the existing structure.
                                                                                                                                                                                                                                                  scheduled so that access is for short periods. Manual lifting and
                                                                                          For building on a major road, narrow road or steeply sloping road:          POWDERED MATERIALS                                                          other manual activity should be restricted in small spaces.
             FLOOR FINISHES Specified                                                     Parking of vehicles or loading/unloading of vehicles on this roadway        Many materials used in the construction of this building can cause
             If finishes have been specified by designer, these have been                 may cause a traffic hazard. During construction, maintenance or             harm if inhaled in powdered form. Persons working on or in the              8. PUBLIC ACCESS
             selected to minimise the risk of floors and paved areas becoming             demolition of this building designated parking for workers and loading      building during construction, operational maintenance or demolition         Public access to construction and demolition sites and to areas
             slippery when wet or when walked on with wet shoes/feet. Any                 areas should be provided. Trained traffic management personnel              should ensure good ventilation and wear Personal Protective                 under maintenance causes risk to workers and public. Warning
             changes to the specified finish should be made in consultation with          should be responsible for the supervision of these areas.                   Equipment including protection against inhalation while using               signs and secure barriers to unauthorised access should be
             the designer or, if this is not practical, surfaces with an equivalent or    For building where on-site loading/unloading is restricted:                 powdered material or when sanding, drilling, cutting or otherwise           provided. Where electrical installations, excavations, plant or loose
             better slip resistance should be chosen.                                     Construction of this building will require loading and unloading of         disturbing or creating powdered material.                                   materials are present they should be secured when not fully
             FLOOR FINISHES By Owner                                                      materials on the roadway. Deliveries should be well planned to avoid                                                                                    supervised.
             If designer has not been involved in the selection of surface                                                                                            TREATED TIMBER
                                                                                          congestion of loading areas and trained traffic management                  The design of this building may include provision for the inclusion of      9. OPERATIONAL USE OF BUILDING
             finishes, the owner is responsible for the selection of surface finishes     personnel should be used to supervise loading/unloading areas.              treated timber within the structure. Dust or fumes from this material       RESIDENTIAL BUILDINGS
             in the pedestrian trafficable areas of this building. Surfaces should        For all buildings:
             be selected in accordance with AS HB 197:1999 and AS/NZ                                                                                                  can be harmful. Persons working on or in the building during                This building has been designed as a residential building. If it, at a
                                                                                          Busy construction and demolition sites present a risk of collision where    construction, operational maintenance or demolition should ensure
             4586:2004.                                                                   deliveries and other traffic are moving within the site. A traffic                                                                                      later date, it is used or intended to be used as a workplace, the
                                                                                                                                                                      good ventilation and wear Personal Protective Equipment including           provisions of the Work Health and Safety Act 2011 or subsequent
             STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                     management plan supervised by trained traffic management
             Due to design restrictions for this building, steps and/or ramps are                                                                                     protection against inhalation of harmful material when sanding,             replacement Act should be applied to the new use.
                                                                                          personnel should be adopted for the work site.                              drilling, cutting or using treated timber in any way that may cause
             included in the building which may be a hazard to workers carrying
                                                                                                                                                                      harmful material to be released. Do not burn treated timber.                10.OTHER HIGH RISK ACTIVITY
             objects or otherwise occupied. Steps should be clearly marked with           4. SERVICES
             both visual and tactile warning during construction, maintenance,                                                                                        VOLATILE ORGANIC COMPOUNDS                                                  All electrical work should be carried out in accordance with Code
                                                                                          GENERAL                                                                     Many types of glue, solvents, spray packs, paints, varnishes and
             demolition and at all times when the building operates as a                                                                                                                                                                          of Practice: Managing Electrical Risks at the Workplace, AS/NZ
                                                                                          Rupture of services during excavation or other activity creates a           some cleaning materials and disinfectants have dangerous
             workplace.                                                                                                                                                                                                                           3012 and all licensing requirements.
                                                                                          variety of risks including release of hazardous material. Existing          emissions. Areas where these are used should be kept well
             Building owners and occupiers should monitor the pedestrian                                                                                                                                                                          All work using Plant should be carried out in accordance with
                                                                                          services are located on or around this site. Where known, these are         ventilated while the material is being used and for a period after
             access ways and in particular access to areas where maintenance                                                                                                                                                                      Code of Practice: Managing Risks of Plant at the Workplace.
                                                                                          identified on the plans but the exact location and extent of                installation. Personal Protective Equipment may also be required.
             is routinely carried out to ensure that surfaces have not moved or                                                                                                                                                                   All work should be carried out in accordance with Code of
                                                                                          services may vary from that indicated. Services should be located           The manufacturer’s recommendations for use must be carefully
             cracked so that they become uneven and present a trip hazard.                                                                                                                                                                        Practice: Managing Noise and Preventing Hearing Loss at Work.
                                                                                          using an appropriate service (such as Dial Before You Dig),                 considered at all times.
             Spills, loose material, stray objects or any other matter that may                                                                                                                                                                   Due to the history of serious incidents it is recommended that
                                                                                          appropriate excavation practice should be used and, where
             cause a slip or trip hazard should be cleaned or removed from                                                                                            SYNTHETIC MINERAL FIBRE                                                     particular care be exercised when undertaking work involving steel
                                                                                          necessary, specialist contractors should be used.
             access ways.                                                                                                                                             Fibreglass, rockwool, ceramic and other material used for thermal or        construction and concrete placement. All the above applies.
                                                                                          Locations with underground power:
             Contractors should be required to maintain a tidy work site during                                                                                       sound insulation may contain synthetic mineral fibre which may be
                                                                                          Underground power lines MAY be located in or around this site. All
             construction, maintenance or demolition to reduce the risk of trips                                                                                      harmful if inhaled or if it comes in contact with the skin, eyes or other
                                                                                          underground power lines must be disconnected or carefully
             and falls in the workplace. Materials for construction or                                                                                                sensitive parts or the body. Personal Protective Equipment including
                                                                                          located and adequate warning signs used prior to any
             maintenance should be stored in designated areas away from                                                                                               protection against inhalation of harmful material should be used when
                                                                                          construction, maintenance or demolition commencing.
             access ways and work areas.                                                                                                                              installing, removing or working near bulk insulation material.
                                                                                          Locations with overhead power lines:
                                                                                          Overhead power lines MAY be near or on this site. These pose a risk         TIMBER FLOORS
                                                                                          of electrocution if struck or approached by lifting devices or other        This building may contain timber floors which have an applied finish.
                                                                                          plant and persons working above ground level. Where there is a              Areas where finishes are applied should be kept well ventilated during
                                                                                          danger of this occurring, power lines should be, where practical,           sanding and application and for a period after installation. Personal
                                                                                          disconnected or relocated. Where this is not practical adequate             Protective Equipment may also be required. The manufacturer’s
                                                                                          warning in the form of bright coloured tape or signage should be            recommendations for use must be carefully considered at all times.
                                                                                          used or a protective barrier provided.




                                                                                   THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT.
                                                                                   THIS INCLUDES (but is not excluded to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTAINERS, DEMOLISHERS.
                                                                                   THE ONSITE BUILDERS WORKPLACE HEALTH & SAFETY MANAGEMENT PLAN SPECIFIC TO THIS SITE OVERRIDES THESE NOTES



Client: Rhys Williams                 Address: 33 Carramar St Tewantin                                                                                                                                                                             Mobile: 0407 693 018                                Date      16/02/2021 12:26:42 PM
                                                                                                                                                                     ACCOLADE Building Designs                                                                                                        Drawn by: S.Horn Drawn for A3 Sheet
RPD: Lot 62 on RP 854302                       Site Area : 708.95 m²                      Wind Classification N3                                                               Proprietor: Steven Horn                                    Email: [email protected] Project Number
                                                                                                                                                                                                                                                                                                                                   0418WR2
Proposed Secondary Residence Slab on Ground, Timber Framed, Sheet Roof,                                                                                                           QBCC Lic. 54806                                         Issue Date          14 - JANUARY - 2021                           Sheet No. 8       of    8
Log in to download the original file

Plans Secondary Residence 33 Carramar St.pdf · 568 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.