GENERAL COMMITTEE MEETING AGENDA 16 MAY 2016
Attachment 3
Page 18 of 53
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2016
Budget Review 4 - March Quarter Review 2015/16 Attachment 3
Summary of Submissions Received $ 649860601 $ 285512374 $ 75,036.18 $ 657364219
te) (leila) pole Tada g Cost Centre / Project 2015/16 Current 2015/16 Actuals Proposed Proposed New Capital / Operating CAPEX PROGRAM lore Te BOC lad ere)
fel Tot a] +) (lle) Budget Budget Budget
CTE airs
CP001 Planning & Noosaville Depot Fire $17,000.00 $51.00 $27,949.00 $44,949.00 Capital Corporate Buildings lan Pearce Fire panel requires replacement
Infrastructure Panel and system
replacement
CP003 Planning & Lake Macdonald Botanic $0.00 $0.00 $15,000.00 $15,000.00 Capital Parks, Playgrounds & Sara Cooke Current shade house structure requires
Infrastructure Gardens Shade Structure Reserves urgent replacement
Design
CP004 Community Services NLC - Stage 2 Construction $45,000.00 $2,855.00 $15,000.00 $60,000.00 Capital Community Facilities Ash Saward Reconfiguration of reception area requires
of redesigned reception additional funding following evaluation of
area quotes.
CP005 Community Services NAC Replacement of $0.00 $11,042.00 $11,042.00 $11,042.00 Capital Community Facilities Ash Saward Replacement of fridge and freezer at the
Fridge and Freezer NAC.
CP006 Community Services NAC - Regrout & recaulk of $30,000.00 $0.00 $3,000.00 $33,000.00 Capital Community Facilities Ash Saward Budget increase required to complete
the Program Pool renewal works following analysis of quotes
received.
CP007 Corporate Services Multiple Sites - Supply and $0.00 $42,680.00 $42,680.00 $42,680.00 Capital Community Facilities Michael Shave Power Correction Factor equipment installed
Installation of PFC at identified sites in September 2015 per
Controller Council resolution 09/04/2015. Electricity
cost savings are expected.
CP008 Executive Office Customer Service Centre $0.00 $18.00 $15,000.00 $15,000.00 Capital Corporate Buildings Debra lezzi Stage 1 is planning and design for
redevelopment of reception and customer
service areas at Tewantin Admin building.
CPO009 Planning & Tewantin Council Office - $0.00 $18,789.00 $50,000.00 $50,000.00 Capital Corporate Buildings Allan Hazell Replacement of air conditioning units at the
Infrastructure Aircon Replacement Tewantin Council Office.
CP010 Corporate Services Plant and fleet replacement $1,854,000.00 $1,258,914.00 $195,000.00 $2,049,000.00 Capital Fleet - Plant Phill Parkman Funding is required for the purchase of 10
program 2015-2016 Replacement vehicles that have lease expiry between now
& 30 June 2016.
CP011 Planning & Tewantin Poinciana $180,000.00 $9,358.00 $30,000.00 $210,000.00 Capital Pathways & Enabling Joe Kuzmer No lighting was considered in the original
Infrastructure Avenue Shared Path Facilities scope and this budget is for the minimum
Upgrade Design & Const amount of lighting required to support the
pathway works.
CP012 Corporate Services North Shore Beachfront $50,000.00 $7,120.00 $56,000.00 $106,000.00 Capital Holiday Parks Narelle Read Additional funds required following evaluation
Campground — Planning of tenders received (refer Council resolution
Consultancy 17/12/2016).
CP013 Planning & Whole of Shire Other $1,087,732.00 $0.00 -($186,859.00) $900,873.00 Capital Sealed Roads Network Bryan OConnor Reallocation of emergent works program
Infrastructure Emergent Works Program ($900k balance remaining).
2015-2016
Page 18 of 53See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.