Appendix H - SDAP Response · REC15/0011
Attached to the e-mail REC15/0011 - Development Application for Reconfiguration of a lot - 1 lot into 11 lots plus balance lot - Appendices F, G, H & I email 2 of 2.
Performance outcomes Acceptable outcomes Response Comment
strategic airports and aviation
facilities, in accordance with a
statutory land use plan, where there
is a demonstrated net benefit for the
state or region and no feasible
alternative exists
(3) coastal protection work or work
necessary to protect coastal
resources or physical coastal
processes.
Table 10.1.2: Operational work
Performance outcomes Acceptable outcomes Response Comment
PO1 Tidal works that is private marine AO1.1 The location and design of tidal works that is N/A The proposed development is not for operational works.
development does not result in adverse private marine development:
impacts to tidal land. (1) is on private land abutting tidal water and used for
Editor’s note: In addressing this performance property access purposes
outcome, the applicant should also have (2) occupies the minimum area reasonably required for
regard to requirements for private marine
its designed purpose
development in the prescribed tidal works
code in the Coastal Protection and (3) is not to be roofed or otherwise covered
Management Regulation 2003. (4) does not require the construction of coastal protection
works, shoreline or riverbank hardening or dredging
Editor’s note: Applications should be for marine access
supported by a report certified by an RPEQ to
(5) does not adversely impact on public safety or public
demonstrate compliance with this performance
outcome.
access and use of the foreshore.
PO2 Development does not result in the No acceptable outcome is prescribed. N/A The proposed development is not for operational works.
disposal of material dredged from an
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
artificial waterway and the at-sea
disposal of material that has
previously been approved for the
waterway.
PO3 The design and construction of an AO3.1 The design and construction of the artificial N/A The proposed development is not for operational works.
artificial waterway maintains coastal waterway provides for sand bypassing where this is
landforms. necessary to prevent erosion of adjacent coasts and
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
20 June 2014 V1.4 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix H - SDAP Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.