Council archive · source document
Appendix H - SDAP Response · REC15/0011
Attached to the e-mail REC15/0011 - Development Application for Reconfiguration of a lot - 1 lot into 11 lots plus balance lot - Appendices F, G, H & I email 2 of 2.
Performance outcomes Acceptable outcomes Response Comment
minimise sedimentation of the waterway.
AND
AO3.2 Clean sand accumulating within an artificial N/A The proposed development is not for operational works.
waterway is returned to the active beach system, in
preference to disposal on land.
PO4 Development that involves dredging AO4.1 A management plan for the development: N/A The proposed development is not for operational works.
includes and complies with a (1) directs the operation of the development
management plan that demonstrates how (2) identifies disposal methods and disposal sites for the
environmental impacts will be managed removed material for the construction and operational
and mitigated, and how the requirements phases of the development
of the National assessment guidelines for (3) outlines how any adverse effects from extraction
dredging, Australia Government activities on sediment transport processes or
Department of the Environment, Water, adjacent coastal landforms will be mitigated or
Heritage and the Arts, 2009 will be met. otherwise remediated by suitably planned and
implemented beach nourishment and rehabilitation
works.
Editor’s note: The development should comply with the National
assessment guidelines for dredging, Australian Government
Department of Environment, Water, Heritage and the Arts, 2009.
AND
AO4.2 For land based disposal of dredged material, any N/A The proposed development is not for operational works.
area used for storing, dewatering, drying or rehandling
dredged material as outlined in the dredge management
plan is:
(1) of sufficient size for the projected volume of dredged
material from relevant capital or maintenance
dredging
(2) protected from future development that would
compromise the use of the area for its intended
purpose of material storage and dewatering.
AND
AO4.3 For at-sea disposal of suitable dredged material, N/A The proposed development is not for operational works.
the dredge management plan specifies that material is
placed at a dredged material disposal site only if it is
demonstrated that it is not feasible to:
(1) dispose of the material above the high water mark, if
the material is from maintenance works for an
existing artificial waterway for which at-sea disposal
was previously approved, or
(2) keep the dredged material within the active sediment
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
20 June 2014 V1.4 Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix H - SDAP Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.