Original source · versioned page text
RFI - Stormwater management (flood report)
Very large file: it may take a few minutes
The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Table 2-1: Summary of Existing Catchment Parameters .................................................................. 7
Table 2-2: Existing Catchment Peak Flows ......................................................................................... 7
Table 2-3: Comparison of WBNM and Rational Method Peak Flows ............................................. 7
Table 2-4: Summary of Developed Catchment Parameters ........................................................... 8
Table 2-5: Comparison of Peak Flows At Site Outlet (Existing Vs. Developed) .............................. 9
Table 2-6: Summary of Basin Structure Details ................................................................................... 9
Table 2-7: Comparison of Peak Flows Site A (Existing Vs. Mitigated) ............................................ 10
Table 2-8: Comparison of Peak Flows Site A (Existing Vs. Mitigated) ............................................ 11
Table 2-9: Existing and Proposed Peak discharge at the Site Boundary. ..................................... 12
Table 2-10: 1% AEP Flood Storage Comparison. ............................................................................. 13
Table 2-11: Lot Levels Compared to Adjacent 1% AEP Peak Flood Levels.................................. 13
Table 3-1: Site Stormwater Quality Objectives (Operational Phase) ............................................ 14
Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export Parameters ........................... 15
Table 3-3: MUSIC Runoff Generation Parameters ........................................................................... 15
Table 3-4: Catchment Areas ............................................................................................................. 15
Table 3-5: Bioretention Design Parameters ...................................................................................... 17
Table 3-6: Sediment Forebay Design Parameters ........................................................................... 18
Table 3-7: MUSIC Results – Load Based Pollutant Outputs ............................................................. 18
LIST OF FIGURES
Figure 1-1: Site Location ....................................................................................................................... 2
Figure 1-2: Overland Flow Paths and Flood Hazard Overlay Mapping ......................................... 3
Figure 2-1: Existing Catchment Delineation ....................................................................................... 6
Figure 2-2: Developed Catchment Delineation ............................................................................... 8
Figure 2-3: 1% (2100) AEP Peak Water Surface Elevation Reporting Locations ........................... 13
Figure 3-1: WSUD Catchment Locality Plan ..................................................................................... 16
Figure 3-2: MUSIC Model Layout ....................................................................................................... 16
APPENDICES
Reconfiguration of Lot Plan and Concept Engineering Drawings
Rational Method and WBNM Outlet
Existing Flood Map
Proposed Flood Map
Flood Afflux Map
21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.