Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RFI - Stormwater management (flood report)

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

      1. INTRODUCTION
      PEAKURBAN Pty Ltd have been engaged by JNE Developments Pty Ltd to prepare a
      Stormwater Management Plan (SMP) in support of a development application to Noosa Shire
      Council (NSC) over land located at 25 Pavilion Street, Pomona (Lot 21 SP 316902). This
      development application seeks a development permit for a Reconfiguration a Lot (ROL) to
      create 10 residential lots.
      The proposed outcome of this document is to identify stormwater management options that
      could be implemented within the development in order to achieve the requirements and
      targets of NSC Planning Scheme “Water Quality and Drainage Code” as well as the relevant
      provisions of State Planning Policy (SPP 2017). The intent of the codes associated with these
      documents will be achieved through the appropriate integration of stormwater
      management options within the proposed residential land-use. The objectives of this
      Stormwater Management Plan are to:
         Detail the proposed stormwater quality management strategy and how the load
          reduction objectives specified by the State Planning Policy (SPP, DSDIP 2017) and NSC
          Planning Scheme are achieved during the operational phase of the development;

         Consider suitable Stormwater Quality Improvement Devices (SQID’s) based on Water
          Sensitive Urban Design (WSUD) principles;

         Outline the maintenance requirements for the proposed stormwater quality improvement
          devices;

         Ensure the development achieves non-worsening of stormwater flows downstream of the
          site; and

         Demonstrate how the lawful point of discharge requirements for the site will be achieved.

         Demonstrate development is located outside of Flood Hazard Overlay Mapping.

      The proposed Plan of Subdivision and concept engineering plans can be found in Appendix
      A.




21-0166SMP01-V1 | Stormwater Management Plan | 25 Pavilion Street, Pomona                             |1
Log in to download the original file

RFI - Stormwater management (flood report).pdf · 10.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.