Council archive · source document
MCU14/0073 Town Planning Report
MCU13/0171 Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. HYDRAULICS AND WATER QUALITY Stormwater Drainage 15. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval, the Queensland Urban Drainage Manual and Engineering report dated 3 September 2013 by Barlow Shelly Consulting Engineers. Stormwater Quality Management 16. A stormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: (a) stormwater quality treatment devices of a size and location generally in accordance with those shown in section 5.0 and 6.0 of the of the Engineering report listed in this Decision Notice (b) swales which are designed in accordance with the Water Sensitive Urban Design Technical Design Guidelines for South East Queensland (c) The works must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water by Design, 2012) 17. All stormwater quality treatment devices must be maintained in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved Operational Works drawings for the stormwater quality treatment system and detailed life cycle costing of the system must be attached as an addendum to this document. Records of all maintenance activities undertaken must be kept and made available to Council upon request. Stormwater Harvesting 18. Operating stormwater harvesting tanks must be provided for the development. The tanks must be provided in accordance with an Operational Works approval and must include in particular: (a) the details identified in section 5.0 and 6.0 of the of the Engineering report listed in this Decision Notice LANDSCAPE & ECOLOGY Landscaping Works 19. The development must be landscaped, in accordance an approval for Operational Works. The particular works must generally accord with the planning scheme Landscape Code and Planning Scheme Policy 3 Landscaping Plants and Guidelines and include: (a) Landscaping to car park areas, including shade trees (b) Vegetated buffer to the Lake Macdonald Drive (c) Vegetated screening of any electrical transformers, bin storage areas and the like from the road frontage (d) Details of any proposed clearing of vegetation and details of retention of any existing trees on the site and road verge to accommodate the PD-DA-FM1420s/4-01/10/2013 Page 4 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 Town Planning ReportRelated documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.