Skip to the record
Accept no imitations.

Council archive · source document

MCU14/0073 Town Planning Report

of 108

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                 MCU13/0171


                   approved development footprint. An Arborist Report is required to
                   validate any proposed clearing.
         (e)       Removal of all weeds species listed in the following standards and
                   legislation:
                   (i)    Declared plants under the Land Protection (Pest and Stock Route
                          Management) Act 2002 and sub-ordinate Regulation 2003
                   (ii) undesirable species, as defined within Planning Scheme Policy 3
                          Landscaping Plants and Guidelines of the Noosa Plan.

20.      All landscape works must be established and maintained in accordance with
         horticultural best practice with construction techniques and irrigation that allow for
         healthy, sustained and vigorous plant growth. All plant material must be allowed
         to grow to full form and be refurbished when its life expectancy is reached.

         Rehabilitation
21.      The land area defined by the vegetated portion contained within the Riparian
         Buffer Area of the Biodiversity Overlay of the Noosa Plan on the subject must be
         rehabilitated in accordance with a rehabilitation plan prepared by a suitably
         qualified person and an approval for Operational Works. Rehabilitation works
         must:
         (a)     restore the habitat value of the land to meet the characteristics of the
                 appropriate regional ecosystem
         (b)     return the land to its natural undisturbed state, where practicable. Where
                 impracticable, provide justification.
         (c)     The treatment of undesirable species, as defined within Planning Scheme
                 Policy 3 Landscaping Plants and Guidelines of the Noosa Plan.


ENVIRONMENT

         Refuse Management
22.      The developer must provide waste storage and disposal facilities in accordance
         with Planning Scheme Policy No. 9 ―       Waste Management Multi-Dwellings and
         Commercial and Industrial Premises‖, including an external imperviously paved
         area correctly sized for all refuse and recycling containers and suitably screened
         from public places and neighbouring properties. A bin wash area is required with
         a cold-water tap, hose and drain outlet connected to the effluent disposal system,
         via a bucket trap. The drain outlet is to be designed to prevent storm water entry
         to the effluent system and this can be achieved with a nib wall 50mm high and up
         to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be
         roofed, or any other design approved by Council‘s delegate.

23.      The development must allow refuse-loading areas to be located off street. All
         vehicles associated with the collection of waste/recyclables, shall enter and leave
         the site in a forward direction.

24.      A Waste Management Plan (Operational) in accordance with Planning Scheme
         Policy No. 9 ―Waste Management Multi-Dwellings and Commercial and Industrial
         Premises‖, shall be developed and implemented on site. The Waste Management
         Plan must include the following as a minimum: -
                  The types and estimated volumes of waste that will be generated from the
                   activities approved within the development.




PD-DA-FM1420s/4-01/10/2013                                                             Page 5 of 16

Used in these records

About this file

File size
8.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0073 Town Planning Report.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.