MCU14/0073 Town Planning Report
OPW13/1038
(a) Civil engineering works; including the principal contractor and the
consulting engineer.
(b) Landscape and vegetation clearing and rehabilitation works.
(c) Erosion and sediment control works.
(d) And other relevant parties.
2. A Construction Management Plan must be submitted to Council and agreed upon
prior to the pre-start meeting and must specifically address the following:
(a) Traffic Management during all aspects of the construct phase including:
(i) A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction.
(ii) Maintenance of safe pedestrian, cyclists and vehicular access
across the frontage of the site both during daily construction and
after daily construction has ceased.
(iii) All necessary measures must be provided to ensure NO adverse
impact on the road safety or interruptions to traffic flows in Lake
MacDonald Drive.
(iv) Proposed fencing to the site during the construction phase of the
development.
(v) Providing safe off-street parking arrangements for trucks,
machineries and construction workers and staff during
construction phase without adversely impacting on the traffic flows
in Lake MacDonald Drive.
(b) Works programme identifying key components of the works and their
respective durations.
(c) Effective procedures and measures to minimise adverse environmental
impact on other properties and roads users including noise and dust
emission.
(d) Establishment of a communication protocol with local residents, adjoining
owners and other concerned and affected parties to advise of
construction times, impacts on traffic and services and other relevant
issues.
(e) Identification of complaint management procedures including:
(i) Contact details for the on-site manager.
(ii) Dispute resolution procedures.
(f) Details on the location of external sources for any fill materials or concrete
mix, the haulage route, type of vehicle to be utilised during these
operations and frequency of usage. NOTE: any damage to the existing
road system as a result of haulage operations must be fully repaired at
the applicant’s expense.
3. At least 5 working days prior to any works commencing, written advice must be
provided to Council detailing:
(a) The name, contact details and ABN for the supervising Registered
Professional Engineer of Queensland (RPEQ) and Principal Contractor.
(b) Proposed dates for commencement and completion of construction.
Page 2 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 Town Planning ReportRelated documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.