MCU14/0073 Town Planning Report
OPW13/1038
Pavement Design and Construction
10. Pavement design for privately owned works must be undertaken in accordance
with the relevant standards. Structural integrity of the driveway and carpark areas
will remain the responsibility of the property owner/developer and must be
certified by an RPEQ.
Site Access and Driveways
11. The property access must be located a minimum of 1 m clear of existing power
poles, streetlights or other signage and the proposed steel beam guardrail for the
culvert near the access to the site. Where necessary the developer is responsible
for any relocation of existing services to provide this clearance and must contact
the relevant service authorities and comply with their requirements in relation to
these works.
Earthworks and Retaining Walls
12. All earthworks on the development site shall be undertaken in accordance with
the provisions of AS 3798 Guidelines on Earthworks for Commercial and
Residential Development.
13. Fall protection must be provided along retaining walls, culverts and bridges with a
height greater than 1 m.
Stormwater Drainage
14. Appropriate scour protection must be provided at the outlet of all stormwater
pipes including temporary outlets.
15. Works associated with this permit must not adversely impact on the exiting
drainage conditions on other properties (eg by blocking or interfering with natural
overland flows) or on the environment by causing scouring.
Erosion and Sediment Control
16. The applicant must ensure non essential exposure of soil is prevented by
restricting the extent of clearing and minimising the duration of soil exposure to
adverse weather conditions. Disturbed areas must be stabilised any cleared area
without delay and prior to rainfall occurring.
17. The applicant must ensure sediment does not leave the site or entre into the
watercourse and Council’s drainage system due surface runoff or on tyres of
vehicles. It is essential to implement, in consultation with the supervising
engineer, appropriate and effective erosion and sediment control measures
throughout the site during all phases of construction.
18. Prior to the completion of the development, all site surfaces must be effectively
stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-
term. For the purpose of this condition, an effectively stabilised surface is defined
as one that does not, or is not likely to result in visible evidence of soil loss
caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
contamination. Certification by the supervising RPEQ for the implemented
stabilisation methods shall be submitted to Council upon the completion of the
works.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 Town Planning ReportRelated documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.