                                                                            OPW13/1038

      Pavement Design and Construction
10.   Pavement design for privately owned works must be undertaken in accordance
      with the relevant standards. Structural integrity of the driveway and carpark areas
      will remain the responsibility of the property owner/developer and must be
      certified by an RPEQ.

      Site Access and Driveways
11.   The property access must be located a minimum of 1 m clear of existing power
      poles, streetlights or other signage and the proposed steel beam guardrail for the
      culvert near the access to the site. Where necessary the developer is responsible
      for any relocation of existing services to provide this clearance and must contact
      the relevant service authorities and comply with their requirements in relation to
      these works.

      Earthworks and Retaining Walls
12.   All earthworks on the development site shall be undertaken in accordance with
      the provisions of AS 3798 Guidelines on Earthworks for Commercial and
      Residential Development.

13.   Fall protection must be provided along retaining walls, culverts and bridges with a
      height greater than 1 m.

      Stormwater Drainage
14.   Appropriate scour protection must be provided at the outlet of all stormwater
      pipes including temporary outlets.
15.   Works associated with this permit must not adversely impact on the exiting
      drainage conditions on other properties (eg by blocking or interfering with natural
      overland flows) or on the environment by causing scouring.

      Erosion and Sediment Control
16.   The applicant must ensure non essential exposure of soil is prevented by
      restricting the extent of clearing and minimising the duration of soil exposure to
      adverse weather conditions. Disturbed areas must be stabilised any cleared area
      without delay and prior to rainfall occurring.

17.   The applicant must ensure sediment does not leave the site or entre into the
      watercourse and Council’s drainage system due surface runoff or on tyres of
      vehicles. It is essential to implement, in consultation with the supervising
      engineer, appropriate and effective erosion and sediment control measures
      throughout the site during all phases of construction.

18.   Prior to the completion of the development, all site surfaces must be effectively
      stabilised using methods which have achieved effective short-term stabilisation
      and which will continue to achieve effective stabilisation in the medium to long-
      term. For the purpose of this condition, an effectively stabilised surface is defined
      as one that does not, or is not likely to result in visible evidence of soil loss
      caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
      contamination. Certification by the supervising RPEQ for the implemented
      stabilisation methods shall be submitted to Council upon the completion of the
      works.




                                                                                 Page 4 of 11

Used in these records

About this file

File size
8.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0073 Town Planning Report.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.