Skip to the record
Accept no substitutions.

Council archive · source document

MCU14/0073 Town Planning Report

of 108

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                               OPW13/1038

       (a)       Rectification to the finished surface levels and materials.
       (b)       No damage to other vegetation for retention.
       (c)       Legal disposal of all removed vegetation and debris.

       Land Rehabilitation
30.    Waterway Rehabilitation works must be supervised, undertaken and certified by
       qualified persons with suitable experience in the field. All works must be
       completed in accordance with this Decision Notice and the approved
       Rehabilitation Plan.

31.    Waterway Rehabilitation works must commence no later than 2 months after the
       commencement of the approved use.

32.    The Waterway Rehabilitation works must not impede the stormwater flows in the
       waterway or adversely impact on the drainage conditions on other properties and
       on Lake MacDonald Drive.

33.    Certification of the completed Waterway Rehabilitation works must be submitted
       to Council no earlier than 12 months and no later than 24 months after the initial
       rehabilitation works commenced. Certification must be supported with
       photographic evidence.

       On-Maintenance Bond
34.    Upon the completion of the operational works and prior to the commencement of
       the approved use, Council requires the provision of a bank guarantee, or a bond
       of $5,000 for the external municipal works and for the landscaping and vegetation
       rehabilitation works. See Advisory Notes for further information.

5.    REFERRAL AGENCIES

Not Applicable

6.    APPROVED PLANS

The following plans are Approved Plans for the development:
Approved Plans
Plan No.               Rev.    Plan Name                                       Date
1014 Dwg No R03        -       Development Layout Plan, prepared by            28/01/2014
                               Barlow Shelley Consulting Engineers
1014 Dwg No R05        A       Lake MacDonald Drive (External Works) &         28/01/2014
                               Visitors Carparking Details, prepared by
                               Barlow Shelley Consulting Engineers
1014 Dwg No R06        -       Roadworks & Drainage Detail Plan – Internal     13/11/2013
                               Work, prepared by Barlow Shelley Consulting
                               Engineers
1014 Dwg No R07        -       Stormwater Drainage Longitudinal Sections &     13/11/2013
                               Details, prepared by Barlow Shelley
                               Consulting Engineers




                                                                                  Page 6 of 11

Used in these records

About this file

File size
8.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0073 Town Planning Report.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.