MCU14/0073 Town Planning Report

of 108

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                          OPW13/1038


1014 Dwg No R09      -      Typical Sections & Miscellaneous Details       13/11/2013
                            Plan, prepared by Barlow Shelley Consulting
                            Engineers
1311-LP1             D      Landscape Plan prepared by Mark Baldock        January
                            Landscape Architect                            2014
1311-LP2             B      Landscape Plan prepared by Mark Baldock        January
                            Landscape Architect                            2014
1311-LP3             B      Landscape Plan-Notes prepared by Mark          January
                            Baldock Landscape Architect                    2014
1311-LP4             B      Existing Tree Retention Plan prepared by       January
                            Mark Baldock Landscape Architect               2014
1311-LP5             B      Existing Tree Retention Plan prepared by       January
                            Mark Baldock Landscape Architect               2014
4400-131216-0.1      -      Waterway Rehabilitation Plan –Proposed         Undated
                            Wimmers Factory prepared by future-plus
                            Environmental

7.   REFERENCED DOCUMENTS

Not Applicable.

8.   ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:

       Engineering Certification
1.     Council has undertaken an audit check of the Operational Works drawings in
       relations to the proposed works. A detailed check of the calculations and
       drawings has not been undertaken, as they have been certified by a RPEQ. The
       RPEQ bears full responsibility for all aspects of the engineering design. Council
       reserves the right to require further amendments and/or additions at a later date
       should design errors become apparent.

       On and Off Maintenance and Inspections Requests
2.     The ‘On Maintenance’ bond or guarantee will be retained by Council during the
       maintenance period as security for the performance of the maintenance
       obligations. The bond will be returned upon formal acceptance of the works ‘Off
       Maintenance’.

3.     A minimum maintenance period of 12 months will apply to the external,
       landscaping and rehabilitation works and thereafter until such time as the works
       are performing in accordance with the approved design unless notifies otherwise.

4.     If Council officers are required to undertake additional inspections of the same
       works, a reinspection fee will be applicable in accordance with Council’s Fees
       and Charges register applicable at the time.




                                                                               Page 7 of 11

Used in these records

About this file

File size
8.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0073 Town Planning Report.pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.