Attachment E - Assessment Env Values Report
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
Lake Macdonald N/A
O12 Vegetation within 400m of the full No solution provided.
ponded water within Lake Macdonald is
retained.
Steep slopes N/A
O13 Vegetation on steep slopes is No solution provided.
retained and managed to avoid erosion
and landslide and to protect natural
resources and values.
Engineering and site works The proposed new carpark and road are located in
O14 Development is sited and designed S14.1 Works, including roads, driveways, fences, existing cleared areas and are located west of the existing
to – sewer lines and other infrastructure – riparian vegetation along Cooroy Creek.
a) provide adequate separation distance a) do not transect areas of vegetation; or
between the vegetation to be b) are co-located within a combined utility corridor; During construction the retained vegetation will be clearly
protected and the development to and marked to ensure the retained vegetation is protected.
avoid disturbing, destabilising and c) provide for fauna underpasses, speed reduction
deoxygenating any tree or altering the devices and associated fencing, lighting and The CEMP for the works will detail vegetation protection
drainage; warning signs, where appropriate; requirements including stockpiling around retained
b) avoid traversing or fragmenting AND vegetation, access requirements, machinery access
vegetation or habitats for significant S14.2 Development within or adjacent to areas of requirements etc.
flora or fauna species; and vegetation, incorporate fauna friendly fences;
c) avoid creating barriers to faunal AND
movement. S14.3 Vegetation is protected from interference
resulting from clearing or construction activities by-
a) clearly marking vegetation to be retained with
flagging tape;
b) installing protective fencing around the dripline of
the vegetation and avoid filling and excavation in
these fenced areas; and
c) ensuring stock piling, storage and vehicle parking
occur outside the identified vegetation areas;
AND
S14.4 Low impact construction techniques are used
around vegetation to minimise interference with the
vegetation.
Filling and excavation The proposed extension will require filling to ensure that
O15 Vegetation is not adversely impacted No solution provided. there is no excavation into capped contaminated materials
upon by earthworks and changes to the on site. Or the SMP for the site is followed if excavation is
hydrological regime, including changes to required.
ground water levels, flooding levels, run-
off and tidal hydraulics. Hydrology and Water Management Consulting has
X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Lower Mill Carpark\Biodiversity Overlay_LowerMillCarparkExtension.docx pg. 12
pg. 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment E - Assessment Env Values Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.