Attachment E - Assessment Env Values Report
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
undertaken a flood study to ensure the proposed works on
the Lower Mill site and the proposed Hinterland
Playground do not affect flooding levels.
13.10 Vegetation management
Replanting and rehabilitation There is no proposed clearing on site.
O16 development provided for S16.1 Landscaping and rehabilitation complements
ecologically important areas to be and supports ecologically important habitats by-
restored and enhanced through the a) utilising native plans of local origin;
following measures- b) utilising suitable plant species identified in PSP3 –
a) siting landscaped areas to landscaping Plants and Guidelines;
complement and enhance existing c) replicating adjacent remnant habitats, including
vegetation; understorey vegetation;
b) removal of all species likely to displace d) creating or enhancing linkages between existing
native flora species or degrade fauna habitats;
habitat; e) avoiding the use of undesirable plant species
c) replanting and rehabilitating degraded listed in table 9.1 of PSP3 landscaping Plans and
habitat; and Guidelines; and
d) replacing any vegetation removed with f) planting riparian zones to filter stormwater run-off
suitable replacement vegetation of and provide for wildlife habitat;
local origin.
AND
S16.2 Vegetation removed is replaced with –
a) plantings of equivalent area that replicate the
floristic structure of the vegetation removed; or
b) where this is not possible due to the
characteristics of the site and the development,
plantings twice the number of the removed trees
and plants of local origin.
Fire management N/A
O17 Fire management measures are No solution provided.
adopted based on ecological principles,
which-
a) maintain and enhance biodiversity;
b) minimise threat of fire to the natural
environment, life and property; and
c) provide for effective use and
maintenance of buildings and
structures.
Clearing protected vegetation in the No clearing proposed.
protected vegetation overlay area No solution provided.
O18 Clearing protected vegetation does
X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Lower Mill Carpark\Biodiversity Overlay_LowerMillCarparkExtension.docx pg. 13
pg. 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment E - Assessment Env Values Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.