Skip to the record
Accept no substitutions.

Original source · versioned page text

Attachment E - Assessment Env Values Report

of 64

Page text read automatically using OCR, there may be inaccuracies

Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay

                                                                                                                                                                   undertaken a flood study to ensure the proposed works on
                                                                                                                                                                   the Lower Mill site and the proposed Hinterland
                                                                                                                                                                   Playground do not affect flooding levels.
     13.10 Vegetation management
     Replanting and rehabilitation                                                                                                                                 There is no proposed clearing on site.
     O16 development provided for                                          S16.1 Landscaping and rehabilitation complements
     ecologically important areas to be                                    and supports ecologically important habitats by-
     restored and enhanced through the                                     a) utilising native plans of local origin;
     following measures-                                                   b) utilising suitable plant species identified in PSP3 –
     a) siting landscaped areas to                                            landscaping Plants and Guidelines;
         complement and enhance existing                                   c) replicating adjacent remnant habitats, including
         vegetation;                                                          understorey vegetation;
     b) removal of all species likely to displace                          d) creating or enhancing linkages between existing
         native flora species or degrade fauna                                habitats;
         habitat;                                                          e) avoiding the use of undesirable plant species
     c) replanting and rehabilitating degraded                                listed in table 9.1 of PSP3 landscaping Plans and
         habitat; and                                                         Guidelines; and
     d) replacing any vegetation removed with                              f) planting riparian zones to filter stormwater run-off
         suitable replacement vegetation of                                   and provide for wildlife habitat;
         local origin.
                                                                           AND
                                                                           S16.2 Vegetation removed is replaced with –
                                                                           a) plantings of equivalent area that replicate the
                                                                              floristic structure of the vegetation removed; or
                                                                           b) where this is not possible due to the
                                                                              characteristics of the site and the development,
                                                                              plantings twice the number of the removed trees
                                                                              and plants of local origin.
     Fire management                                                                                                                                               N/A
     O17 Fire management measures are                                      No solution provided.
     adopted based on ecological principles,
     which-
     a) maintain and enhance biodiversity;
     b) minimise threat of fire to the natural
        environment, life and property; and
     c) provide for effective use and
        maintenance of buildings and
        structures.
     Clearing protected vegetation in the                                                                                                                          No clearing proposed.
     protected vegetation overlay area                                     No solution provided.
     O18 Clearing protected vegetation does
     X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Lower Mill Carpark\Biodiversity Overlay_LowerMillCarparkExtension.docx   pg. 13
     pg. 13

Log in to download the original (Attachment E - Assessment Env Values Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.