SPECIAL COMMITTEE MEETING REPORT 5 JUNE 2019
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume(m³) *specify proposed *specify contractor contractor and
re-use or on-site and recycling outlet landfill site or
recycling methods other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
completed by the demolition contractor.
Waste Storage
51. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties.
52. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer,
via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the
sewerage system which can be achieved by a bunded area, with a nib wall height of 100mm
maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²). Alternatively,
the waste area can be roofed, or any other appropriate design approved by Council.
Noise
53. Upgraded building envelope constructions and the provision of mechanical ventilation/air
conditioning which achieves the ventilation requirements of the Building Code of Australia,
in accordance with the Second Joint Report of Experts in Noise (30 May 2018) for Planning
and Environment Court Appeal 4066 of 2017, including:
i. the facades of the Visitor accommodation Type 4 motel building facing towards the IGA
building and IGA carparking area;
ii. the facades of the Visitor accommodation Type 4 dwelling units facing towards the IGA
building; and
iii. the facades of the Visitor accommodation Type 4 dwelling units facing towards the hotel
building, drive-through access road and drive-through bottleshop, and carparking
areas.
54. Prior to the commencement of use written certification is required from a suitably qualified
person confirming that upgrades to the building facades and provision of mechanical
ventilation/air conditioning comply with the recommendations of the Second Joint Report of
Experts in Noise (30 May 2018) for Planning and Environment Court Appeal 4066 of 2017.
55. Prior to the commencement of any use or sealing of Plan of Survey, whichever occurs first,
an acoustic screen must be constructed around the IGA rooftop mechanical plant to a height
of 3.0 metres above the roof level plant deck, as shown on Figure 4 and described in Section
4.6 of the Second Joint Report of Experts in Noise (30 May 2018) for Planning and
Environment Court Appeal 4066 of 2017.
Page 54 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.