Original source · versioned page text
2021-03-09 P&E Agenda - Item 5 - Attachment 1 - Noosa Trail Masterplan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Case Study:
WARBURTON, YARRA RANGES COUNCIL
Yarra Ranges Council (Victoria) is currently in is a well-known tourism hub that is yet to fully
the planning stages of developing Warburton as leverage its trails source and recently large
a world-class trails destination. The destination will investments have been committed to specifically
be based on a series of mountain bike trails and develop (and redevelop) its trails network for multi-
hubs all descending into Warburton. In addition, user groups. Predictive outcomes for local economic
the area has great walking/running trails and road stimulus are in excess of $26 million for the mountain
cycling opportunities. Trail-based businesses biking trail development alone, with walking, running
will be able to develop and grow based on the and some paddling additional stimulus opportunities,
concentration of visitors in the valley and town. as per the Noosa region.
The region is a comparable learning base for
Noosa as it has similar characteristics in terms
of being located near larger population centres,
NOOSA TRAIL MASTERPLAN | APRIL 2020 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.