Original source · versioned page text
Decision Notice - OPW22 0303 [As Published]
Plan No. Rev. Plan/Document Name Date
CN.0.101C 2 Cover Sheet prepared by MPN 25 November 2022
Consulting
CN.0.102C 2 Construction Notes prepared by MPN 25 November 2022
Consulting
BE.1.101C 3 Bulk Earthworks Plan prepared by MPN 15 February 2023
Consulting
CP.1.101C 3 Civil Works Plan prepared by MPN 15 February 2023
Consulting
CP.2.101C 2 Civil Works Details prepared by MPN 25 November 2022
Consulting
LM.1.101C 3 Signs and Pavement marking Plan – 15 February 2023
Sheet 1 prepared by MPN Consulting
LM.1.102C 1 Signs and Pavement marking Plan – 25 November 2022
Sheet 2 prepared by MPN Consulting
PV.1.101C 3 Pavement Types Plan prepared by 15 February 2023
MPN Consulting
SW.2.101C 2 Bio-Retention Basin Details prepared 25 November 2022
by MPN Consulting
SW.3.101C 2 Stormwater Drainage Longitudinal 25 November 2022
Sections prepared by MPN Consulting
8662 B Operational Management & 9 February 2023
Maintenance Plan prepare by MPN
Consulting
2021032 - 000 06 Cover Sheet – Drawing schedule, sheet 15 February 2023
layout plan by Place Design Group
2021032 - 001 06 General specification by Place Design 15 February 2023
Group
2021032 - 002 06 Finishes schedule and legends by 15 February 2023
Place Design Group
2021032 - 002 06 Planting schedule by Place Design 15 February 2023
Group
2021032 - 101 06 Existing trees plan by Place Design 15 February 2023
Group
2021032 - 201 06 Surfaces plan by Place Design Group 15 February 2023
2021032 - 301 06 Grading plan – Levels and drainage 15 February 2023
sheet by Place Design Group
Page 2 of 16
Document Set ID: 22382210
Version: 3, Version Date: 21/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original