Decision Notice - OPW22 0303 [As Published]
2021032 – 601 06 Planting plan by Place Design Group 15 February 2023
2021032 – 901-1 06 Hardscape details by Place Design 15 February 2023
Group
2021032 – 902-1 06 Softscape details by Place Design 15 February 2023
Group
PR0587 001 Fauna Management Plan by Biodiverse 9 February 2023
Environmental
22196449 1 Tree Management Plan by Consult 21 November 2023
Arborist
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 26 April 2025, unless an application to extend the currency period is
approved by Council.
Site Specific Conditions
3. The required stormwater storage tanks must be clearly shown on the hydraulic drawings
approved through the building permit.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
4. Submit amended plans to Council as described in the List of plans requiring amendments.
Plans must be submitted and approved prior to the pre-start meeting.
5. Tree protection fencing must be installed under the supervision of the qualified person*.
(Refer to Advisory Note)
6. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
7. A condition report of the Council drainage system within the frontages of the site must be
completed for agreement at the prestart meeting.
8. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting / prior to any works commencing.
9. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
10. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Arboreal works.
c. Fauna management works.
d. Landscape works.
e. Erosion and sediment control works;
f. Other relevant parties
11. A Construction Management Plan must be submitted to Council at least 5 business days
prior to the pre-start meeting and must specifically address the following:
Page 3 of 16
Document Set ID: 22382210
Version: 3, Version Date: 21/04/2023