Original source · versioned page text
B - Code Compliance
Earthworks Code
PO7 AO7 PO7 – Not Applicable
Haulage of material to and from a site ensures— No acceptable outcome provided No earthworks are proposed.
a) minimal disturbance to neighbouring
properties and properties along the haulage
route; and
b) Council’s road infrastructure including
pavements is not adversely affected.
PO8 AO8 AO8 – Not Applicable
The layout of the development provides adequate, All earthworks, including cut and fill batters, retaining No earthworks are proposed.
clearly defined and easily accessible— walls and the like are contained within the subject site.
a) on-site vehicle parking and manoeuvring
areas; and
b) loading and manoeuvring areas for delivery
and service vehicles.
PO9 AO9 AO9 – Not Applicable
On sloping sites development follows the natural Cut or fill is less than 1.5 metres in depth relative to the No earthworks are proposed.
landform wherever practical and excavation or filling natural ground level.
is minimal.
PO10 AO10 PO10 – Not Applicable
Earthworks and vehicular access do not adversely No acceptable outcome provided No earthworks are proposed.
impact on the capacity, operations and maintenance
of existing infrastructure.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.