Skip to the record
The gold standard in government transparency.

Original source · versioned page text

B - Code Compliance

of 99
Earthworks Code

PO11                                                     AO11                                                     PO11 – Not Applicable
Earthworks minimise any adverse impact upon              No acceptable outcome provided                           No earthworks are proposed.
groundwater, watercourses, drainage             lines,
wetlands, and native vegetation.
PO12                                                     PO12.1                                                       AO12.1 – AO12.3 – Not Applicable
Dam location and construction does not impact            Where the site is in the Rural zone—                         No earthworks are proposed.
upon neighbouring properties or road reserves, in            a) the land has a slope of less than 25% (1:4);
terms of—                                                    b) the earthworks including cut and fill batters and
    a) hydrology;                                                 retaining walls are setback a minimum of 50
    b) alteration of existing overland flow paths and             metres from the property boundary; and
        patterns;                                            c) the size of the lot is greater than 5 hectares.
    c) landslide or failure of dam wall; and             AO12.2
    d) effluent disposal areas.                          Where the site is in the Rural residential zone or the Rural
                                                         zone and the lot is less than 5 hectares:
                                                             a) the land has a slope of less than 1:6;
                                                             b) the earthworks including cut and fill batters and
                                                                  retaining walls are setback a minimum of 20
                                                                  metres from the property boundary; and
                                                             c) the dam work involves less than 500m³ of
                                                                  material.
                                                         AO12.3
                                                         For all other zones—
                                                         No acceptable outcome provided

Log in to download the original (B - Code Compliance.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.