Skip to the record
The only place to find full transcripts.

Original source · versioned page text

B - Code Compliance

of 99
Existing Services Code

Overall Outcome                                                                 Response
The Overall Outcomes of the Existing Services Code are:
2a). Underground infrastructure is accessible for maintenance purposes.         2a - Complies
                                                                                The existing underground infrastructure will remain accessible for maintenance.

2b) Existing services are identified and methods of protection and access are 2b - Complies
implemented in the design of the development.                                 The proposal will not change the already in place protection and access methods.

Performance outcomes                                   Acceptable outcomes                                      Response
Assessable Development
PO1                                                    AO1                                                      PO1 – Not Applicable
Development near a stormwater drain, overland flow     No acceptable outcome provided                           No Changes to the stormwater systems are proposed.
path or associated structure does not—
    a) adversely affect the function of the service;
    b) place an additional load on the service; and
    c) unduly increase future maintenance costs.
PO2                                                    AO2.1                                                     AO2.1 – AO2.3 – Not Applicable
Maintenance access is provided to all stormwater       For trunk infrastructure, a registered easement in favour No Changes to the stormwater systems are proposed.
drains, overland flow paths and associated             of Council is created over all underground infrastructure
structures.                                            located in private property.
                                                       AO2.2
                                                       The width of the easement required is in accordance with
                                                       Council’s Planning Scheme Policy PSP6 Engineering
                                                       Design Standards – Roads, drainage and earthworks.
                                                       AO2.3
                                                       The easement is centred over the centreline of the
                                                       infrastructure.

Log in to download the original (B - Code Compliance.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.