Water Quality and Drainage Code
Performance outcomes Acceptable outcomes Response
Stormwater Drainage Design
PO1 AO1 AO1 – Not Applicable
The development and its stormwater management A stormwater management plan is prepared consistent The development does not involve any physical works
system is planned and designed having regard to: with PSP6 Engineering Design Standards - Roads, and will maintain the existing stormwater drainage
the natural features of the site; drainage and earthworks. system and lawful point of discharge.
the need to avoid impacts and potential risks to
ecologically important areas;
the likely effectiveness of erosion and sediment
control and stormwater drainage measures during
rainfall events during and post construction; and
the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1 AO2.1 to AO2.4 – Not Applicable
Stormwater drainage infrastructure is planned, Stormwater drainage planning, design and construction The development does not involve any works
designed and constructed to: is in accordance with PSP6 Engineering Design Standards maintaining the existing stormwater drainage system
a) incorporate allowance for increased flood risk - Roads, drainage and earthworks and the latest version and lawful point of discharge.
and tidal inundation through pipework as a of the Queensland Urban Drainage Design Manual.
result of cilmate change and sea level rise; AO2.2
b) ensure the development is adequately drained; The stormwater drainage system connects to a lawful
and point of discharge in accordance with PSP6 Engineering
c) ensure stormwater is managed and lawfully Design Standards - Roads, drainage and earthworks.
discharged without altering stormwater drainage AO2.3
characteristics external to the site. Stormwater flows discharging from the development are
demonstrated to be consistent with pre-development
characteristics.
AO2.4
Development provides for the management of
stormwater to incorporate appropriate allowance for
climate change impacts (including rainfall intensity and
sea level rise), in accordance with PSP6 Engineering
Design Standards – Roads, Drainage and Earthworks.
PO3 AO3.1 AO3.1 – Not Applicable
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.