Skip to the record
Accept no imitations.

Original source · versioned page text

B - Code Compliance.pdf

of 99
Water Quality and Drainage Code

Stormwater drainage infrastructure conveys run-off       Stormwater drainage infrastructure meets the desired The development does not involve any works
in a manner that allows roads to deliver desired         standards of service for roads functionality set out in PSP6 maintaining the existing stormwater drainage system
standards of service appropriate to the local            Engineering Design Standards - Roads, Drainage and and lawful point of discharge.
conditions and local stormwater drainage                 Earthworks.
characteristics.
PO4                                                      AO4.1                                                         AO4.1 to AO4.5 – Not Applicable
Stormwater infrastructure is compatible with existing    The location, design and construction of stormwater           The development does not involve any physical
infrastructure, allows for easy access for the ongoing   drainage structures is in accordance with PSP6                works, maintaining the existing stormwater drainage
maintenance by Council, is cost effective across its     Engineering Design Standards - Roads, drainage and            system and lawful point of discharge.
design life.                                             earthworks.
                                                         AO4.2                                                         No additional easements are necessary, and no
                                                         Where infrastructure is located on private land an            alterations or repairs to infrastructure are required
                                                         easement is dedicated over the infrastructure in              ensuring no cost to the Council.
                                                         accordance with PSP6 Engineering Design Standards -
                                                         Roads, drainage and earthworks.
                                                         AO4.3
                                                         Any alterations or repairs to infrastructure as a result of
                                                         the development are made at no cost to Council.
                                                         AO4.4
                                                         Development avoids stormwater inflow and infiltration to
                                                         the sewer infrastructure network.
                                                         AO4.5
                                                         Stormwater infrastructure is designed to minimise
                                                         maintenance costs and the requirement for specialized
                                                         equipment for maintenance techniques.
PO5                                                      AO5.1                                                         AO5.1 to AO5.3 – Not Applicable
Stormwater drainage infrastructure is aligned to         Stormwater drainage infrastructure avoids crossing            The development does not involve any works
avoid crossing waterways, wetlands, drainage lines       waterways, wetlands drainage lines and ecologically           maintaining the existing stormwater drainage system
and ecological important areas, or where it is           important areas or follows the edge of existing disturbed     and lawful point of discharge.
demonstrated this is unavoidable, disturbed areas        areas.
are reinstated and revegetated upon completion of        AO5.2
works.                                                   Stormwater drainage infrastructure is co-located with
                                                         other infrastructure within a combined utility corridor
                                                         where appropriate.
                                                         AO5.3
                                                         Temporary vehicular crossings of waterways must be
                                                         designed and constructed to be consistent with the

Log in to download the original (B - Code Compliance.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.