Water Quality and Drainage Code
objectives in PSP6 Engineering Design Standards -
Roads, drainage and earthworks
AO12.2
Instream structures such as roads, bridges, culverts, and
other stormwater infrastructure do not cause barriers to
fish passage and facilitate the movement of terrestrial and
aquatic fauna along waterway corridors.
AO12.3
Benthic substrate retains a continuous grade with the
direction of flow consistent with the natural bed profile.
PO13 AO13.1 AO13.1 to AO13.2 – Complies
Development is designed and constructed to The location and form of stormwater discharge points do There are no changes to the lawful point of discharge
maintain surface and ground water balances that not alter the pre-development hydrology of receiving or flows, and there is no interference with
sustain the environmental values of water dependent surface water or groundwater. groundwater recharge or discharge areas.
ecosystems, including downstream aquatic, riparian, AO13.2
wetland and terrestrial ecosystems. Developments located on groundwater recharge or
discharge areas are designed and managed in
accordance with a groundwater recharge and discharge
management plan prepared by a suitably experienced
and qualified groundwater hydrologist. The groundwater
recharge or discharge must demonstrate that the
development does not affect groundwater balances
beyond the property boundaries.
Editor's Note— PSP6 Engineering Design Standards - Roads, drainage
and earthworks provides guidance on prepare a groundwater
recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14 AO14.1 AO14.1 to AO14.5 – Not Applicable
Construction methods provide for appropriate An erosion and sediment control plan prepared in The development does not involve any building or
controls to avoid entry and transport of litter, accordance with the International Erosion Control engineering works that require erosion and sediment
sediment, and associated prescribed water Association Best Practice Books demonstrates that the control.
contaminants into receiving waters. capture and release of stormwater achieves the design
objectives listed in Table A: Construction phase –
Editor's note— Water contaminants are prescribed in the stormwater management design objectives of the State
Environmental Protection Act 1994. Planning Policy (Appendix 2).
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (B - Code Compliance.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.