Skip to the record
Search everything, all in one place.

Original source · versioned page text

B - Code Compliance.pdf

of 99
Water Quality and Drainage Code

                                                   Editor’s note— PSP6 Engineering Design Standards - Roads, drainage
                                                   and earthworks provides guidance on requirements for preparing an
                                                   Erosion Management Plan.
                                                   AO14.2
                                                   Construction works are designed and managed to restrict
                                                   the extent of clearing and soil exposure to the minimum
                                                   necessary for access, and safe construction at any one
                                                   time.
                                                   AO14.3
                                                   For buildings:
                                                   a) upstream runoff is diverted around the construction
                                                        site;
                                                   b) sediment barriers are provided downslope of
                                                        disturbed areas to prevent sediment washing into
                                                        gutters, drains and waterways , wetlands or drainage
                                                        lines either on or off the site; and
                                                   c) temporary or permanent downpipes are connected to
                                                        the stormwater system before laying the roof; or
                                                   d) localised erosion is avoided by directing flow from
                                                        downpipes over non-erosive areas.
                                                   AO14.4
                                                   Chemical flocculants used as part of an erosion and
                                                   sediment control plan do not harm the environmental
                                                   values within receiving waters.
                                                   AO14.5
                                                   Appropriately sized litter containment areas, with
                                                   provision for sorting recyclables are provided for the type
                                                   of litter expected to be generated onsite.
Wastewater management and effluent disposal
PO15                                               AO15                                                                 AO16 – Complies
Development does not discharge wastewater unless   Wastewater (non-sewage) generated from the                           All wastewater is discharged into the existing network
it can be demonstrated to not compromise           development is collected and contained on-site, and is:              comprising reticulated sewer and a rising main on
environmental values of waters and water quality   a) lawfully disposed to sewer; or                                    Noosa Drive.
objectives.                                        b) transferred off-site for treatment/disposal to an
                                                      appropriately licenced facility;

Log in to download the original (B - Code Compliance.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.