Original source · versioned page text
RFI response signed
Brian Naismith B App Sc (Surv) Consulting Cadastral Surveyor Items 2 & 3 The Stormwater Management Plan has been prepared by Aquaintel. Reviewing that document, together with the Civil Drawings by Tod Consulting, it is considered all drainage and water quality issues requested have been properly addressed. Retaining walls are incorporated in the biobasin design, deemed reasonably justified in the technical note provided by Tod Consulting. Items 4&5 The Civil Drawings by Tod Consulting indicate road design, both frontage road and new road. Kerbing and widening have been incorporated as relevant to the proposed development, in Pottery Street and its intersection with Red Street. Underground servicing is preliminary designed, including stormwater drainage arrangements and sewerage (not requested in RFI). Item 6 The Bushfire Hazard Assessment & Management Plan has been prepared by North Coast Environmental Services. It addresses the required planning legislation and finds the development proposed wholly compliant. Should Council have any queries or require additional information please contact me at your earliest convenience. Regards Zz Brian Naismith Consultant 0477 925 871 95 Groundwater Road, Southside Q 4570 M 0477 925 871 | E [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI response signed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.