Brian Naismith
B App Sc (Surv)
Consulting Cadastral Surveyor

Items 2 & 3

The Stormwater Management Plan has been prepared by Aquaintel. Reviewing that document,
together with the Civil Drawings by Tod Consulting, it is considered all drainage and water
quality issues requested have been properly addressed. Retaining walls are incorporated in the
biobasin design, deemed reasonably justified in the technical note provided by Tod Consulting.

Items 4&5

The Civil Drawings by Tod Consulting indicate road design, both frontage road and new road.
Kerbing and widening have been incorporated as relevant to the proposed development, in
Pottery Street and its intersection with Red Street. Underground servicing is preliminary
designed, including stormwater drainage arrangements and sewerage (not requested in RFI).

Item 6

The Bushfire Hazard Assessment & Management Plan has been prepared by North
Coast Environmental Services. It addresses the required planning legislation and
finds the development proposed wholly compliant.

Should Council have any queries or require additional information please contact

me at your earliest convenience.

Regards

Zz

Brian Naismith
Consultant
0477 925 871

95 Groundwater Road, Southside Q 4570
M 0477 925 871 | E [email protected]

Log in to download the original (RFI response signed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.