Negotiated Decision Notice MCU20 0071 · MCU20/0071
Private Infrastructure
117. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority
General
118. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
119. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
120. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
121. Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5
business days notice of preferred inspection time.
It should be noted prior to arranging a prestart meeting the Right of Appeal Period of 20
business days should have been passed or the applicant has confirmed by a letter or an
email that he/she has accepted the conditions of Decision Notice and waived his/her appeal
right.
122. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
123. A minimum maintenance period of 12 months will apply to all municipal works and thereafter
until such time as the works are performing in accordance with the approved design unless
noted otherwise.
Environmental Advisory Notes
124. The Environmental Protection Act 1994 states that a person must not carry out any activity
that causes, or is likely to cause, environmental harm unless the person takes all reasonable
and practicable measures to prevent or minimise the harm. Environmental harm includes
environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
construction and landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
125. Accepted best practice standards include:
a. the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2
or other superseding document subsequently adopted by Council;
b. Best Practice Erosion and Sediment Control, International Erosion Control Association
(2008)
126. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the final inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
Page 17 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice MCU20 0071Related documentApplication case desk ↗
About this file
- File size
- 352 KB (small file)
- File type
No other editions are linked here.