109. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the supervising
RPEQ must submit to Council:
a. Certification that all works have been undertaken and completed in accordance with
the requirements of this Permit.
b. As Constructed details in accordance with Council’s Planning Scheme Policy and the
conditions of this permit.
Maintenance Bonds.
110. The developer is responsible for the maintenance of all development works which are to
become Council assets (includes civil infrastructure, landscaping, open space areas, park
improvements) for a minimum period of 12 months or as otherwise advised by Council. This
period will commence from Council’s formal acceptance of the development “on
maintenance”.
111. The developer must submit a Maintenance Bond to Council to ensure the above works are
maintained during this period. The maintenance bond must be:
a. 5% of the agreed value of the development obligations; or
b. $1500, whichever is the greater amount
Off Maintenance
112. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
113. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. A Council inspection reveals works do not comply with approval requirements.
b. Submitted certification wrongly states works comply with approval requirements
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
114. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Environmental Health
115. It is highly recommended that the person you engage to certify the installation of mechanical
equipment is involved at the plan development stage so they can recommend where this
equipment is best located. They can also advise about noise enclosures and can make other
suggestions to avoid noise problems. It is a lot more costly to try and deal with noise
problems after everything is built.
Qualified Person
116. For the purpose of supervising landscape works and preparing a landscape certification, a
qualified person is considered to be a landscape architect, landscape designer or
horticulturist with a minimum of three years current experience in the field of landscape
design.
Page 16 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice MCU20 0071Related documentApplication case desk ↗
About this file
- File size
- 352 KB (small file)
- File type
No other editions are linked here.