Negotiated Decision Notice MCU20 0071 · MCU20/0071

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
              or
      b.      where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and assets
      must first be referred to the relevant service authority for approval.

                             OPERATIONAL WORKS - OPW20/0130
      Approved Plans
62.   Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table unless
      otherwise amended by these conditions.

           Plan No.         Rev. Plan/Document Name                                     Date

           30008-OW3.1             Operational Works: Earthworks, prepared by Jan 2020
                                   SCG Consulting Engineers
                                   As Annotated by Council

           30008-OW3.2      A      Operational   Works:   Earthworks    Sections 22/09/2020
                                   prepared by SCG Consulting Engineers

           30008-OW5.1      A      Operational Works: Driveway Access & Details, 22/09/2020
                                   prepared by SCG Consulting Engineers
                                   As Annotated by Council

           30008-OW5.2      A      Operational Works: Driveway Levels & Sections, 22/09/2020
                                   prepared by SCG Consulting Engineers
                                   As Annotated by Council

           30008-SW1.1      A      Operational Works: Stormwater Management, May 2019
                                   prepared by SCG Consulting Engineers
                                   As Annotated by Council

           20024 - CD-001   F      Landscape Plan, prepared by Project Urban            12.10.2020

           20024 - CD-002   D      Landscape Notes, prepared by Project Urban           09.10.2020

           20024 - CD-003   E      Planting Schedule, prepared by Project Urban         12.10.2020

           20024 - CD-200   C      Construction Details, prepared by Project Urban      25.02.2020

      Currency Period
63.   The Currency Period for this development approval lapses if the development has not
      substantially started by 12 November 2026, unless an application to extend the currency
      period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
      Engineering
64.   Detailed engineering design plan/s for the upgrade of the public concrete footpath for the full
      frontages of the site, prepared and certified by suitably qualified RPEQ, must be submitted
      and endorsed by Council prior to requesting a prestart meeting. The plan/s must
      include/address the following:



                                                                                       Page 9 of 21

Used in these records

About this file

File size
352 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice MCU20 0071.pdf · 352 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.