2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFigure 2: Condition of Other Infrastructure by Number of Assets The breakdown of replacement costs by asset condition is detailed in the graph below (figure 3). The importance of the graph is to identify the value of each asset classes’ condition and where future investments are required to renew or rehabilitate the Stormwater Infrastructure assets. The importance of the financial value against each condition enables Council to identify the necessary funding requirements of each asset class into the future. Once an asset is rehabilitated or renewed the condition rating will be adjusted within the asset management system (T1). The timing and renewal of the stormwater assets will be addressed in the development of future renewal programs and will be reflected in Council’s 10-year Capital Works Program. Figure 3: Stormwater Asset Condition by Value Asset Management Plan: Stormwater Infrastructure Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.