Original source · versioned page text
2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThere are a number of different asset classes within the Stormwater Infrastructure that are yet to have a physical condition assessment assigned to them within the Technology One System until the data has been reconciled. For the purpose of this AMP, the assets within the financial asset register are referred to as commissioned assets and have been assigned an age-based condition which is determined on the remaining life of the asset. Further development and prioritisation is required to ensure that all Stormwater Infrastructure assets are reconciled within the asset system and condition assessments are undertaken or for those assessments completed are assigned within technology one system. In asset reporting an approach to linking individual assets to the specific asset class has been undertaken. Figure 1 details the pipes, pits and structures asset conditions and at figure 2 includes all other Stormwater Infrastructure asset classes that are considered in this AMP. These assets are grouped consistently and reported accordingly throughout this document. Any Stormwater Infrastructure assets that have reached condition 5 will be included in the relevant renewal programs of the 10-year Capital Works Program. Figure 1: Condition by Number of Assets Figure 2 identifies all Stormwater Infrastructure assets other than those assets defined in Figure 1. The graph highlights that there are only a small volume of other stormwater infrastructure assets that are currently on the asset register. The reported condition is based on the anticipated remaining life of the stormwater infrastructure assets and does not reflect the physical condition of those assets. Undertaking physical condition assessments of the assets represented in Figure 2 is required. Physical condition knowledge will assist in developing a more realistic approach to developing renewal plans that are prioritised and planned. Asset Management Plan: Stormwater Infrastructure Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.